[1] SHUGUANG ZHAN, LEO G KROON, LUCAS P VEELENTURF, et al. Real- time high- speed train rescheduling in case of a complete blockage[J]. Transportation Research Part B, 2015(78): 182-201.
[2] GRAZIANA CAVONE, MARIAGRAZIA DOTOLI, NICOLA EPICOCO, et al. A decision making procedure for robust train rescheduling based on mixed integer linear programming and data envelopment analysis[J]. Applied Mathematical Modelling, 2017(52): 255-273.
[3] JOSE LUIS ESPINOSA- ARANDA, RICARDO GARCÍA-RÓDENAS. A demand-based weighted train delay approach for rescheduling railway networks in real time[J]. Journal of Rail Transport Planning & Management, 2013(3): 1-13.
[4] FRANCESCO CORMAN, ANDREA D’ ARIANO, ALESSIO D MARRA, et al. Integrating train scheduling and delay management in real- time railway traffic control[J]. Transportation Research Part E, 2017(105): 213-239.
[5] 钱名军, 宋建业. 基于粗糙集的列车运行调整方法研究[J]. 交通运输系统工程与信息, 2008, 8(4): 122-126. [QIAN M J, SONG J Y. Train operation adjustment based on rough set theory[J]. Journal of Transportation Systems Engineering and Information Technology, 2008, 8(4): 122-126.]
[6] 李晓娟, 韩宝明, 李得伟, 等. 基于转换极大代数和序优化的高速列车运行调整方法[J]. 中国铁道科学, 2013, 34 (6): 124-130. [LI X J, HAN B M, LI D W, et al. Method for high-speed train operation adjustment based on switching max-plus-linear system and ordinal optimization[J]. China Railway Science, 2013, 34(6): 124-130.]
[7] GOVERDE RMP. Railway timetable stability analysis using max-plus system theory[J]. Transportation Research Part B, 2006(41): 179-201.]
[8] BÜKER T, SEYBOLD B. Stochastic modelling of delay propagation in large networks[J]. Journal of Rail Transport Planning & Management, 2012, 2(1- 2): 34- 50.
[9] 魏宾宾. 完全多叉树的叶子节点构造搜索模型的算法与 应 用 [J]. 电 脑 知 识 与 技 术, 2014,10(10): 2436- 2438, 2474. [WEI B B. Algorithm based leaf node of complete multi- tree to construct search model and it application[J]. Computer Knowledge and Technology, 2014, 10(10): 2436-2438, 2474.] |