首页 | 官方网站   微博 | 高级检索  
     

考虑列位合理占用的动车所调车作业计划编制优化
引用本文:户佐安,郑磊,周姝.考虑列位合理占用的动车所调车作业计划编制优化[J].西南交通大学学报,2022,57(1):65-73.
作者姓名:户佐安  郑磊  周姝
作者单位:1.西南交通大学交通运输与物流学院, 四川 成都 6117562.西南交通大学综合交通大数据应用技术国家工程实验室, 四川 成都 6117563.西南交通大学综合交通运输智能化国家地方联合工程实验室, 四川 成都 6117564.中铁二院工程集团有限责任公司, 四川 成都 610031
基金项目:国家自然科学基金(61104175);;四川省科技计划(2021YJ0067);;成都市科技项目(2020-RK00-00204-ZF);
摘    要:合理编制动车组调车作业计划可提高动车所的作业效率和检修能力,在动车所各功能区域和股道布置确定的前提下,分析动车组编组状态及股道列位占用对调车作业的影响.?以减少调车作业过程中股道占用次数为目标,以动车组作业时间、调车作业次序和股道类型为约束,建立考虑股道列位占用的动车所调车作业计划编制优化模型,设计基于调车作业可行路径...

关 键 词:铁路运输  动车所  调车作业计划  列位占用  模拟退火算法
收稿时间:2021-02-08

Optimization of Shunting Operation Plan at Electric Multiple Units Depot Considering Train Position Proper Occupancy
HU Zuoan,ZHENG Lei,ZHOU Shu.Optimization of Shunting Operation Plan at Electric Multiple Units Depot Considering Train Position Proper Occupancy[J].Journal of Southwest Jiaotong University,2022,57(1):65-73.
Authors:HU Zuoan  ZHENG Lei  ZHOU Shu
Affiliation:1.School of Transportation and Logistics, Southwest Jiaotong University, Chengdu 611756, China2.National Engineering Laboratory Integrated Transportation Big Data Application Technology, Southwest Jiaotong University, Chengdu 611756, China3.National United Engineering Laboratory of Integrated and Intelligent Transportation, Southwest Jiaotong University, Chengdu 611756, China4.China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, China
Abstract:Reasonable shunting operation plans can greatly improve the operation efficiency and maintenance capacity of the electric multiple unit (EMU) depots. On the premise of determinate layout of tracks and each function sections, the effect of EMU marshalling status and occupation on the shunting operartion plan is analyzed. With the objective of reducing track occupancy times during shunting operations, and taking EMU operation time, shunting operation sequence and track type as constraints, an optimization model for shunting operation plan considering train position occupancy is established, a simulated annealing algorithm based on the feasible route generation and the priority exchange for shunting operations is proposed. Finally, an example of shunting operation plan at the EMU depot is used to verify the effectiveness of the model and algorithm. The results show that the proposed approach yields a shunting operation plan in a short time and with a small number of track occupancy. The number of EMU transfers is reduced to 34, and 80% of the EMUs have realized the quick storage operation. 
Keywords:
点击此处可从《西南交通大学学报》浏览原始摘要信息
点击此处可从《西南交通大学学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号