CSM工法在深基坑支护工程中的应用 |
| |
引用本文: | 吴海艳,林森斌.CSM工法在深基坑支护工程中的应用[J].路基工程,2013,0(2):168-173. |
| |
作者姓名: | 吴海艳 林森斌 |
| |
作者单位: | 铁道第三勘察设计院集团有限公司,天津 300251 |
| |
摘 要: | 以天津地铁五号线建昌道站深基坑支护工程为例,对CSM工法计算原理进行分析,并对型钢水泥土搅拌墙设计计算、型钢拔出验算、抗浮验算进行了研究,结果表明:CSM工法墙内插型钢,成墙效率高,可代替传统地连墙作深基坑围护结构,安全可行。
|
关 键 词: | CSM工法 深基坑支护 计算原理 稳定性分析 |
收稿时间: | 2019-11-10 |
Application of CSM Method in Deep Foundation Pit Support Engineering |
| |
Authors: | WU Haiyan LIN Senbin |
| |
Affiliation: | (The Third Railway Survey and Design institute Group Corporation, Tianjin 300251, China) |
| |
Abstract: | Taking the deep foundation.pit support engineering at the station of Jianchangdao of Tianjin Metro Line 5 as an example, this paper analyzes the calculation principle of CSM method and studies the design of shaped steel and cement-soil mixed wall, and the calculation of both pulling force of the shaped steel and floating resistance. The results show that CSM method is safe and feasible, in respect of which the wall plugged in with shaped continuous wall as deep steel leads to high construction efficiency and may be substitute for traditional foundation pit support structure, and worthy of wide application. |
| |
Keywords: | CSM method foundation pit support calculation principle stability analysis |
本文献已被 维普 等数据库收录! |
| 点击此处可从《路基工程》浏览原始摘要信息 |
|
点击此处可从《路基工程》下载全文 |