首页 | 官方网站   微博 | 高级检索  
     

基于加权秩和比法的隔震梁桥失效模式研究
引用本文:张云,谭平,黄佳栋.基于加权秩和比法的隔震梁桥失效模式研究[J].西南交通大学学报,2018,53(1):72-78.
作者姓名:张云  谭平  黄佳栋
作者单位:广西交通科学研究院有限公司;广西翔路建设有限责任公司;广州大学工程抗震研究中心;
基金项目:广西科技攻关资助项目桂科攻14124004-4-5973计划资助项目2011CB013606国家自然科学基金联合基金资助项目1334209
摘    要:为了综合评价桥梁在地震作用下失效模式的信息,考虑地震动中存在的不确定性影响,对实际工程中的某6跨隔震连续梁桥的失效模式进行了分析.基于IDA法,选用16条足够反映地震动中存在的不确定性且PDA分布在一个较宽强度范围内的地震动,对桥梁中支座、桥墩墩底这两个最容易失效的部位分别基于位移和修正的Park-Ang损伤理论判断其失效,引用加权秩和比法综合了16条地震动作用下的桥梁失效模式的评价信息,分析给出具有统计意义的失效模式,并找出了桥梁的最弱失效模式.研究结果表明:该隔震连续梁桥的失效模式为该桥梁中墩的隔震支座先失效,然后是桥梁过渡墩支座失效,最后是边墩底部和边墩的支座失效;桥梁的最弱失效模式为桥梁所有隔震支座先失效,其次是边墩底部失效,然后是中墩失效,最后是过渡墩失效. 

关 键 词:隔震    失效模式    IDA法    连续梁桥
收稿时间:2016-03-20

Failure Mode of Isolated Beam Bridge by Weighted Rank Sum Ratio Method
ZHANG Yun,TAN Ping,HUANG Jiadong.Failure Mode of Isolated Beam Bridge by Weighted Rank Sum Ratio Method[J].Journal of Southwest Jiaotong University,2018,53(1):72-78.
Authors:ZHANG Yun  TAN Ping  HUANG Jiadong
Abstract:To estimate the failure modes of seismically isolated continuous girder bridges, a practical engineering with six spans was analyzed considering the uncertainty of seismic ground motions. Sixteen ground motion records were selected to be used in IDA method, which could provide sufficient accuracy of seismic analysis demands, and the PGA of these records were distributed in a wide range. Bearings and the bottom of piers were the most vulnerable parts of the bridge, of which failure criteria were estimated by displacement and modified Park-Ang damage theory, respectively. And weighted rank sum ratio method was adopted to analyze evaluation information of the bridge under sixteen ground motion records, then the statistically significant failure modes and the weakest failure mode of the bridge were identified. The results show that the final failure mode of the isolation continuous girder bridge arises at the isolation bearings of the middle piers, at the isolation bearings of the transition piers, and at the bottom of side piers and bearings. The weakest failure mode of this bridge happens with all isolation bearings cease to be effective first, then it comes to the bottom of the side piers and the middle piers, and finally the transitional piers. 
Keywords:
本文献已被 CNKI 等数据库收录!
点击此处可从《西南交通大学学报》浏览原始摘要信息
点击此处可从《西南交通大学学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号