时速200公里客运专线风沙路基施工技术
引用本文:李登辉,杨小东.时速200公里客运专线风沙路基施工技术[J].路基工程,2010,0(1):163-165.
作者姓名:李登辉  杨小东
作者单位:中铁二局机械筑路工程有限公司, 成都 610031
摘    要:沙漠地区路基施工存在填料含水量损失快、运输及压实困难的特点。文中以太中银铁路在陕北风沙地区的路基填筑工艺研究为例,对设计200 km/h客运专线风沙路基施工所涉及的填料运输、碾压、检测及防护等技术进行探讨,为类似条件下的铁路施工提供技术参考。

关 键 词:时速200公里    铁路    风沙路基    施工
收稿时间:2019-11-09

Construction Technique of Sandy Subgrade in 200km/h Passenger Dedicated Lines
Authors:LI Deng-hui  YANG Xiao-dong
Affiliation:Mechanical Construction Engineering Co./a>;Ltd/a>;China Railway Erju Group/a>;Chengdu 610031/a>;China
Abstract:Subgrade construction in desert area has the characteristics of rapid water loss and difficult filling transport and compaction of filling.This paper takes the subgrade filling technique of Taiyuan-Zhongwei-Yinchuan Railway in Sanbei sandy area as the example to explore filling transport,compaction,inspection and protection technique for sandy subgrade construction in 200km/h passenger dedicated lines in order to provide technical reference for railway constriction under the similar conditions.
Keywords:200km/h  railway  sandy subgrade  construction  