无砟轨道CRTSⅢ型板施工技术 |
| |
引用本文: | 陈加升.无砟轨道CRTSⅢ型板施工技术[J].路基工程,2014,0(3):184-186. |
| |
作者姓名: | 陈加升 |
| |
作者单位: | 中铁八局集团第三工程有限公司, 贵阳 550007 |
| |
摘 要: | 以成彭双线高速铁路CRTSⅢ型板无砟轨道为例,总结了施工测量控制、混凝土底座施工、轨道板的粗铺和精调、自密实混凝土调整层施工工艺以及关键点和控制点。
|
关 键 词: | CRTSⅢ型板 自密实混凝土 无砟轨道 |
收稿时间: | 2019-11-11 |
Construction Technology for CRTS Ⅲ Slab Ballastless Track |
| |
Authors: | CHEN Jiasheng |
| |
Affiliation: | CHEN Jiasheng ( No. 3 Engineering Co. , Ltd. of China Railway Eighth Bureau Group , Guiyang 550007, China) |
| |
Abstract: | Taking CRTS Ⅲslab ballastless track for Chengdu-Pengzhou Double-track High-speed Railway as an example, the paper summarized the construction measurement control, concrete base construction, track slab placement and adjustment, the construction technology for the adjusting layer of self-compacting concrete, and the key and control points. |
| |
Keywords: | CRTS Ⅲ slab self-compacting concrete ballastless track |