首页 | 官方网站   微博 | 高级检索  
     

岩石锚杆抗浮在青岛客站地下候车室施工的应用
引用本文:程广朝.岩石锚杆抗浮在青岛客站地下候车室施工的应用[J].路基工程,2011,0(1):144-145,149.
作者姓名:程广朝
作者单位:中铁十局集团有限公司, 济南 250101
摘    要:结合新建青岛客站主站房地下候车室工程实例,依据地下水勘察报告、区域水文地质资料和现场情况,对地下水作用进行了综合分析;对比了钻孔灌注桩抗浮方案与岩石锚杆抗浮方案的优缺点,决定采用岩石锚杆抗浮,并顺利实施,取得了良好效果。

关 键 词:地下室    水作用    抗浮方案    岩石抗浮锚杆
收稿时间:2019-11-10

Application of Anti-float Rock Bolt in Underground Waiting Room Construction of Qingdao Passenger Station
Authors:CHENG Guang-chao
Affiliation:CHENG Guang-chao (China Railway Tenth Engineering Group,Co.,Ltd.,Jinan 250101,China)
Abstract:Combined with the example of underground waiting room construction of the main building of newly-built Qingdao Passenger Station,underground water effect is generally analyzed according to underground water survey report,regional hydrological data and site conditions.The advantages and disadvantages of cast-in-situ pored pile and rock bolt used for anti-floating program are separately analyzed.Through comparison,rock bolt anti-floating program is proven better and implemented successfully,which has achieved...
Keywords:underground room  water effect  anti-float program  anti-float rock bolt  
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《路基工程》浏览原始摘要信息
点击此处可从《路基工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号