首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
To cope with the fatigue cracking occurred to the asphalt mixture on steel deck avement,it is put forward that the fatigue life of asphalt mixture can be improved by reducing the ailure energy of each hysteresis loop of asphalt mixture according to the cumulative dissipated energy and hysteresis loop theory in the principle of viscoelasticity for asphalt mixture Based on this principle,a kind of modified asphalt with high elasticity was developed,and its high and low temperature performances and fatigue performances were also tested The result shows that (1) low temperature deformability of the high?elastic modified asphalt mixture has remarkably improved and low temperature bending strain of girder at -10 ℃ is above 10 000 με; (2) the fatigue life of modified asphalt mixture with high elasticity has greatly improved by 4?point bending beam test compared with common modified asphalt mixture The fatigue life at 1 000 με deformability is about 19 million times which is about 20 times longer than that of ordinary asphalt mixture  相似文献   

2.
Stresses of pavement with flexible base of LSAM-30,ATPB-30 and AC-30I at the most adverse point under the function of traffic load and temperature load as well as the coupling of them were calculated and compared by finite element method. The result indicates that flexible bases of LSAM?30 and ATPB?30 are more effective in the prevention of reflection crack Because of the great volume of coarse aggregate and large maximum nominal particle?size,the LSAM-30 thermal conductivity is greater,and the temperature shrinking coefficient is lower as well as the modulus of resilience,which could reduce the emperature gradient among the structure layers effectively and then minish the thermal stress At the  same time,the adequate flexibility performance of the LSAM may also absorb strain energy at the crack of the semi?rigid subbase sufficiently As a result,itpresented preferable reflection crack resistance A case study was conducted to do comparative analysis of anti?cracking performance of LSAM-30,ATPB-30 and AC-30I flexible bases A long?term follow?up observation of test roads with the three bases shows that the pavement with LSMA base is in good condition and no sign of crack found while pavements with ATPB?30 and AC?30I flexible bases have varying degrees of crack LSMA flexible base has an obvious performance of anti-crack  相似文献   

3.
Impacts on asphalt mixture's high temperature performance with PR series additives added by means of rutting test and Repeated Shear Test (Constant Height) (RSCH) were investigated The analytic results of the two tests show that (1) rutting test is not suitable for the high temperature performance evaluation of asphalt mixture with PR series additives added for the reason of the conflict between dynamic stability and rut depth; (2) the results of RSCH,such as K1,K2,N and γ,show very well consistency which is suitable  for the high temperature performance evaluation of asphalt mixture with PR series additives  added The results of RSCH show that asphalt mixture with PR PLAST S (PRS)  added has the best performance,the PR FLEX MODULE (PRM) one is the next and t he original one is the worst for the high temperature anti?shear performance  相似文献   

4.
To analyze influencing factors and evaluation method of low-temperature performance of porous asphalt mixture,first,three kinds of modified binder were chosen as original,thin film aging and pressure aging samples for customary index test and bending beam rheometer (BBR) test at -12 ℃ to evaluate low-temperature performance of these modified binders Then,evaluation of the low-temperature anti?cracking performance of different kinds of porous asphalt mixture was made by thermal stress restrained sample test (TSRST) At the sam e time,the result of abovementioned TSRST were compared with the TSRST result of  samples of the porous asphalt mixtures after long?term aging to evaluate the influence of  aging on low-temperature performance of porous asphalt mixtures The results show that (1) TSRST result of porous asphalt mixtures coincides with creep stiffnesses of BBR test of modified binders; (2) the fracture temperatures of the porous asphalt mixtures increase and their fracture stresses decrease after aging; (3) the fracture stresses of porous asphalt mixtures are just one-third of those of dense?gradation asphalt mixtures while the fracture temperatures almost the same,which indicates that their low?temperature performances are almost the same  相似文献   

5.
In order to study the fatigue behavior of RC beams strengthened with High Performance Ferrocement Laminates (HPFL) under overloading conditions,static and fatigue experiments were conducted on two control beams and nine strengthened beams The failure mode,fatigue life,deflection and material strain under overloading conditions were analyzed The result shows that (1) fatigue failure of the beams subjected to overload starts with steel rupture at the bottom and the fatigue life is only between 327 000 and 668 000 while fatigue  life of strengthened beams is greater than two million times in case of not overload ing; (2) compared with the control specimen,the fatigue life of strengthened beams is obvio usly extended and increased with the increase of steel mesh consumption; (3) after the same number of cycles,the deflections,the strains of concrete and steels of four strengthened beams are lower than those of the control specimen Debonding at the interface of HPFL and concrete is not observed because of shear pins planted at the end of the beams  相似文献   

6.
Mori-Tanaka equivalent inclusion micromechanics theory was employed to investigate the viscoelasticity of asphalt mixture Asphalt mixture was regarded as composites which treated coarse aggregate as a rigid inclusion and the mixture of fine aggregate,filler and binder as viscoelastic matrix The constitutive relations of coarse aggregate inclusion and fine aggregate-filler-binder matrix were converted into elastic problems by Laplace transformation Then the Mori-Tanaka equivalent inclusion and average theory were used to deduce the  viscoelastic performance of asphalt mixture based on that of asphalt mortar in  Laplace space The result shows that (1) coarse aggregate inclusion can enhance the viscoelastic performance of fine aggregate?filler?binder matrix and viscoelastic constitutive relation of asphalt mixtures can be expressed as the product of an enhancement coefficient of coarse aggregate and the viscoelastic constitutive relation of fine aggregate?filler?binder matrix; (2) the viscoelasticity of the complex asphalt mixture can be predicted from the viscoelasticity of the homogeneous fine aggregate?filler?binder matrix by using the nhancement coefficient; (3) the enhancement coefficient is higher than 10 and it rises with increasing of coarse aggregates' volumetric fraction or Poisson's ratio of fine aggregate-filler-binder matrix but the effect of the former is more important than that of the latter  相似文献   

7.
In order to assess temperature field in microwave heating for recycling asphalt pavements,a 2D mathematic heat transfer model was developed based on Fourier heat transfer theory The microwave internal heat?generation was researched by using surface field of pyramidal horn replacing approximate radiation field In addition,the boundary conditions were built and normalization processing was implemented The control volume based finite differential method (CV-BDM) was used to establish the implicit discrete scheme of the conservation equations,and the numerical value simulation was employed By continuous or intermittent  radiation heating technique,a microwave heating experimental system at 2 145 GHz was carried out to investigate temperature variation characteristics of asphalt pavements along with heating time The result shows that (1) the increase of temperature of asphalt mixture during microwave heating is obviously nonlinear,the temperature rises slowly in the initial stage of the heating but increases rapidly in the late heating period; (2) the temperature distribution is non-uniform that the temperature in central area of the surface is higher while it is lower on edge; (3) the uniformity of temperature within asphalt mixtures can be improved by using intermittent heating technique,and the heating time must be reasonable The simulation results are in preferable agreement with the experiment  相似文献   

8.
he prestressed concrete skewed box girder with transversely segmental construction was brought out on the basis of the need in the engineering,both model experiments and FE analysis of the presented construction and the beam box with integral construction were carried out With the analysis of the obtained data by mathematical statistics,comparison of table and graph,and the corresponding FE analysis,the difference of mechanical performances of both constructions was analyzed under various experimental loading cases The results show that (1) the deflection of the presented construction is about 53% larger than that of the beam box with integral construction,the longitudinal strain is 135% larger than that of the latter,and the longitudinal strain of the cast concrete is 59% as large as that of the same area at the beam box with integral construction before concrete cracking; (2) there exists stress redistribution in the cross-section of presented construction,which can restrain the tensional distortion of the wet?joint,and the value of the stress cannot be computed by the current FE program  相似文献   

9.
Four methods of erecting steel stiffening truss girder of suspension bridge,including the deck lifting gantry crane method,the cable-mounted crane method,the cantilever erection method with derrick crane and the incremental launching method,were studied Based on construction conditions of the bridge,according to the optimal combination of various factors such as construction safety,quality,period,environmental protection and economic performance,etc,the cantilever erection method with derrick crane was recommended for the bridge. On this basis,three categories of connection in cantilever erection methods,including the all hinged method,the successive fully splicing method and the successive splicing with temporary erection hinge method,were studied The successive splicing with temporary erection hinge method was recommended in the bridge with consideration of the requirements of construction safety,quality and time limit In addition,the traction method of hangers at the top end during cantilever erection was studied Finally,the erection method of three key  stages,including the first segment near the pylon,the standard segment,as well as the closure segment of steel stiffening truss girde,r was studied. The cantilever erection method with derrick crane provides a new way for design and construction of long-span suspension bridge with steel stiffening truss girder in the western area of China  相似文献   

10.
Confronted with accidents in a shallow?buried weak tunnel using the bench excavation method,such as great subsidence and cracks in the ground surface as well as those in the preliminary support,a double downside drifts construction method was presented The drifts were used to detect geological conditions and reinforce the lower parts of the tunnel Its construction procedures and load transiting mechanism were then described Its Construction behavior was also studied by numerical simulation using software MIDAS The results show that (1) double-side drifts can improve tunnel load,the key construction step is arch ring excavation and core soil is good to keep tunnel steady; (2) weak parts mainly l ocate at wall foot of drifts,wall foot and crown foot of tunnel,and the connections; (3) reinforcement of soil under the drifts has no apparent effect on improving rock deformation and support load Advice on construction was proposed that main parts to be reinforced are drifts (its foot depth,connection parts with tunnel,and its corners) and core soil should be kept if rock is unsteady and needs reinforcing  相似文献   

11.
According to the features of high?liquid?limit foundation in southwest mountainous area and the characteristics of geogrid reinforced cushion,geogrid reinforced cushion was used to reinforce high?liquid foundation By using the elastic?plastic finite element analysis method,the mechanisms of the geogrid reinforced cushion were studied The results show that geogrid reinforced cushion can greatly reduce loading and deformation and improve the high?liquid foundation stability In addition,the effect of factors such as location,lay ers,stiffness,etc of geogrids on reinforcement and the regularity were discussed Compari son of centrifugal model test result with numerical calculation result indicates that the error is negligible between them,which shows that (1) constitutive relationship,calculation model and calculation parameters are reasonable; (2) numerical simulation reflects deformation behavior of high?liquid foundation improvement effectively and the results of numerical analysis are re liable  相似文献   

12.
The effect of damaged transverse connection of diaphragm beams on the bearing capacity of prefabricated concrete T?beam bridges was studied through model experiment and finite element analysis On the basis of standard drawing of 16 m T?beam bridge,a refabricated concrete T?beam bridge model on the scale of 1 to 4 was designed by using of welding steel plate The impacts of different condition on transverse load distribution were discussed The result shows that (1) flange connection has little impact on the transverse load distribution when the diaphragm beams are connected reliably; (2) the damage of transverse connections has much influence on the transverse load distribution of adjacent girders but it has little effect on the girders apart from them; (3) if a certain transverse connection is damaged entirely except for that of the end diaphragm beams,the load distribution would not degenerate to the conditions determined by the flange connection because of the advantageous effects of the other diaphragm beams; (4) only when the bilateral diaphragms of one beam are damaged at the same time,the lateral load distribution will degenerate to the conditions determined by the flange connection  相似文献   

13.
SUN Jun 《隧道建设》2018,38(10):1592-1602
The author explains why a giant undersea immersed tube tunnel was selected for the sea area of the main channel of the east side of the Hong Kong Zhuhai Macao Fixed Link Project, instead of employing a bridge or shield tunnel; and summarizes several domestic and international leading innovative technologies applied in the island tunnel construction of the Hong Kong Zhuhai Macao Fixed Link Project, including the use of huge self stabilized steel cylinders as retaining structure of foundation pits for constructing the artificial islands, the large area and ultra deep "sand compaction pile (SCP) composite foundation" reinforcement technology, "semi rigid segment joints", "sandwich" steel RC combined inverted trapezoid closure joints, and crack control and anti corrosion/durability design for RC tube structure. All these technologies reflect Chinese wisdom and Chinese speed. The author also points out some technical issues to which attention should be paid after the immersed tube tunnel of the project is put into operation: (1) Will the post construction settlement and differential settlement of the immersed tube tunnel further develop after the project is open to traffic? How much is the final convergence value? If it exceeds the limit, what control measures should be taken?(2) How to deal with the issue that the joints of large/small elements or segments are open? How to ensure that all the large and small joints between segments of the tube are "watertight"? Furthermore, the author presents some suggestions and control measures: (1) For excessive post construction settlement (especially differential settlement) spotted on large joints, it is suggested to incorporate "micro disturbance grouting" for post treatment. (2) If a joint opens under the excessive positive bending moment at the floor slab, it is believed that the open joint on the floor slab can be closed again by cutting off some prestressed tendons in the roof slab of the segment to reduce the positive bending moment of the section.  相似文献   

14.
The QC Training Center is focused on QS-9000 and ISO/TS 16949 training, and cooperates with SAE International to present auto related technology and quality management technology training for China's auto industry. There is one Master Trainer (responsible for the training of QS-9000 auditors and trainers) and 9 qualified trainers recognized by the American Big Three as well as Plexus Co. Ltd.. Authorized by AIAG (Auto Industry Action Group dealing with the copyright of QS-9000 on behalf of the American Big Three), CATARC is the  相似文献   

15.
The cross sea channel for the Qiongzhou Strait not only provides a solution for transportation, but also plays an important role in the political and economic development of the region. In addition, the project has an extensive impact on many fields, such as energy, national defense, science and technology, opening up and reform, comprehensive utilization and so on. It is a significant project to enhance China′s comprehensive national strength, defend the country′s territorial integrity and promote regional economic development. The geological conditions across the Qiongzhou Strait are complex. A large amount of existing engineering geological information and hydrogeological data are collected, based on which the seismic impact on subsea tunnels and the main geological conditions including tectonic structures are analyzed. Different options crossing the Qiongzhou Strait have been considered and compared in terms of engineering geology, environmental condition, as well as the construction feasibility. The analystical results indicate that a subsea tunnel has more advantages over a bridge. Because more complicated technical difficulties have to be solved for a highway tunnel which would potentially increase construction and operation costs, a railway tunnel scheme is recommended. Vehicles can be carried by trains through the Qiongzhou Strait railway tunnel. Based on the seabed topography and geological conditions, four preliminary railway tunnel routes are proposed. After a comprehensive comparative analysis, the railway tunnel route Ⅱ is identified to be superior to other alternatives and should be the basis for determining the final tunnel layout. The proposed tunnel cross section includes two railway tunnels and one service tunnel. All the three tunnels have the same structural form and dimension and will be constructed by shield.  相似文献   

16.
SUN Jun 《隧道建设》2018,38(11):1753-1764
The author discusses the necessity and urgency of constructing the Bohai Bay Crossing Corridor from the following aspects such as the increasing traffic volume, the convenience of the transportation after the corridor is constructed, and the regional benefit brought by the corridor. As for the timing of the construction of the sea crossing corridor, the author thinks that as long as the national economic situation permits and relevant conditions are basically available, the preliminary work should be carried out as soon as possible so as to promote the early commencement of the construction. Regarding the proposal of building another coastal national highway/high speed railway along the Bohai Bay coast, the author puts forward his viewpoints. In the aspect of construction risks, the author thinks that the geological risks in the construction of the Bohai Bay Crossing Corridor are very difficult to be dealt with; therefore, strict and detailed risk assessment should be carried out, and effective safety measures should be taken to mitigate the risks. The author also briefly describes the technological advantages of the tunnel proposal selected for the Bohai Bay Crossing Corridor, and briefly analyzes some key technological issues in the tunnel construction. The author describes the construction scheme and construction period estimation for the sea crossing corridor in details. The author makes the following proposal are given: (1)the hard rock tunnel boring machine (TBM) assisted by the drilling and blasting method should be used for the construction of the long sea crossing tunnel of Bohai Bay Crossing Corridor; (2) a parallel service tunnel shall be arranged between the twin main tunnel tubes; (3) in Proposal 2, the diameters of the twin main tunnel tubes and the service tunnel should be 8.0 m and 55 m, respectively. The proposal has two optional solutions: Solution 1: The service tunnel ( 55 m) located between the main tunnel tubes will be constructed first; for the main tunnel tubes, the disassembled TBMs ( 8 m) and the backup gantries are assembled for tunneling after arriving at the main tunnel tubes through the service tunnel and the cross passage; Solution 2 (alternative): Tunneling with  55 m TBM is carried out; the  55 m TBM will be dismantled to pass through the cross passage, and then be re assembled after arriving at the main tunnel; the start section (180 m) of main tunnel tube will be formed by  55 m TBM before it is enlarged to  8 m by drilling and blasting method; or the cross passage is enlarged to a large curved space to allow the 5.5 m TBM passing throught without disassembly. Comparison and contrast will be made and the preferred solution will be adopted. According to the rough estimation on the construction period of the 125 km long sea crossing tunnel, the total construction period of "completed tunnel" will be about 19 years (including 5 years of detailed offshore investigation) in Solution 1.  相似文献   

17.
Targeted to the issue of lacking of systematic design standards for thermal insulation and drainage facilities of railway tunnels in cold regions, the authors propose the method of design division of railway tunnels in cold regions based on the division of cold regions, the current technical status of thermal insulation and drainage in tunnels, and the investigation on some tunnel freezing damage cases in northeastern China and the northern part of North China. Through analyzing the application conditions of the thermal insulation and drainage facilities and combining the measured temperatures in the operating tunnels and drainage facilities, the authors propose the suggested length for the thermal insulation and drainage facilities of tunnels in cold regions in different divisions. The results show that: (1)railway tunnels in cold regions may be classified into 5 divisions based on annual average temperature and average temperature in the coldest month; (2)the elevated thermal insulation ditch only adapts to the cold regions with a higher temperature; (3)an effective measure for thermal insulation and drainage in cold regions is to embed ditches into structures within a certain range from the portal; (4)the ditches may be arranged in structures for the trunk section of long tunnels equipped with thermal insulation measures; (5)for the tunnels with the necessary conditions available, the double spur grade and a steep gradient in the longitudinal slope may be applied, which is beneficial to improving drainage conditions and preventing the ditch from freezing.  相似文献   

18.
At the end of 2002, the former State Economic and Trade Commission issued the Regulations on Production Access of Motorcycles together with detailed rules for implementation. Motorcycle makers were supposed to reach the Phase I demand of the Regulations by the end of 2003. The implementation of the document has had an enormous bearing on China's motorcycle industry.  相似文献   

19.
The GIL chamber in the utility tunnel under Tanxinpei Road in Wuhan is an ultra long closed structure. Heat exhaust ventilation is the controlling problem in engineering design for the project, especially the heat transfer between the tunnel and the surrounding soil in the long term. A one dimensional model for the GIL chamber is established by using the IDA tunnel simulation software to analyze the short term and long term heat exhaust, respectively. The short term heat exhaust is analyzed for the typical climate of summer/winter/transitional seasons and the long term analysis is carried out under the seasonal changes in 1 year/ 10 years/ 30 years. The short term analysis results indicate that the slope of the utility tunnel and the temperature gradient lead to lower ventilation efficiency in certain areas. The long term analysis results show that the air temperature in the GIL chamber and the wall temperature rise most pronouncedly during the first 5-6 years of operation and remain stable for the remaining time within 30 years. It also is found that around 10%-40% of the heat is released to the surrounding soil. A three dimensional model of the GIL chamber is established using the fluid mechanics based program, OpenFOAM, for 3D simulation. The effects of cables and brackets on the temperature and velocity fields in the chamber are analyzed. The effect of non uniformity of velocity distribution and the stack effect on the temperature distribution in the GIL chamber are revealed. The results can provide some reference for the design and specification revision of heat exhaust ventilation for similar utility tunnels in the future.  相似文献   

20.
Shenzhen Chunfeng Tunnel is one of the shield tunnels under construction with the largest diameter in mainland of China. The whole tunnel passes through the coastal composite stratum, with rock from broken to integral, and the strength of some sections reaches 173 MPa. The tunnel under crosses the railway, subway, bridge and multiple buildings closely in a complex and sensitive environment. Combining the stratum situation and characteristics of large diameter shield machine, the problems that will be faced during the construction process, including low rock breaking efficiency of shield machine, discharge stagnation and jamming of the chamber, settlement control in sensitive environment, and impact of large diameter shield segment floating, cracking and construction on urban traffic, are analyzed. Based on the engineering experience, the following solutions are proposed: a shield rock breaking efficiency solution for the complete extremely hard rock section, settlement control measures for adjacent buildings and structures of shield driven tunnels, solutions for jamming and discharge stagnation of large diameter slurry shield, comprehensive measures for prevention and control of shield segment floating and cracking, and a slag treatment plan for downtown areas. Chunfeng Tunnel tests the wisdom of Chinese builders with its tremendous volume and strict construction standards, and it also has certain reference significance for other similar projects.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号