首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 78 毫秒
1.
From a capacity perspective, efficient utilization of a railway corridor has two main objectives; avoidance of schedule conflicts, and finding a proper balance between capacity utilization and level of service (LOS). There are several timetable tools and commercial rail simulation packages available to assist in reaching these objectives, but few of them offer both automatic train conflict resolution and automatic timetable management features for the different types of corridor configurations. This research presents a new rescheduling model to address some of the current limitations. The multi-objective linear programming (LP) model is called “Hybrid Optimization of Train Schedules” (HOTS), and it works together with commercial rail simulation tools to improve capacity utilization or LOS metrics. The HOTS model uses both conflict resolution and timetable compression techniques and is applicable to single-, double-, and multiple-track corridors (N-track networks), using both directional and bi-directional operations. This paper presents the approach, formulation and data requirements for the HOTS model. Single and multi-track case studies test and demonstrate the model’s train conflict resolution and timetable compression capabilities, and the model’s results are validated by using RailSys simulation package. The HOTS model performs well in each tested scenario, providing comparable results (either improved or similar) to the commercial packages.  相似文献   

2.
The concept of rescheduling is essential to activity-based modeling in order to calculate effects of both unexpected incidents and adaptation of individuals to traffic demand management measures. When collaboration between individuals is involved or timetable based public transportation modes are chosen, rescheduling becomes complex. This paper describes a new framework to investigate algorithms for rescheduling at a large scale. The framework allows to explicitly model the information flow between traffic information services and travelers. It combines macroscopic traffic assignment with microscopic simulation of agents adapting their schedules. Perception filtering is introduced to allow for traveler specific interpretation of perceived macroscopic data and for information going unnoticed; perception filters feed person specific short term predictions about the environment required for schedule adaptation. Individuals are assumed to maximize schedule utility. Initial agendas are created by the FEATHERS activity-based schedule generator for mutually independent individuals using an undisturbed loaded transportation network. The new framework allows both actor behavior and external phenomena to influence the transportation network state; individuals interpret the state changes via perception filtering and start adapting their schedules, again affecting the network via updated traffic demand. The first rescheduling mechanism that has been investigated uses marginal utility that monotonically decreases with activity duration and a monotonically converging relaxation algorithm to efficiently determine the new activity timing. The current framework implementation is aimed to support re-timing, re-location and activity re-sequencing; re-routing at the level of the individual however, requires microscopic travel simulation.  相似文献   

3.
In passenger railway operations, unforeseen events require railway operators to adjust their timetable and their resource schedules. The passengers will also adapt their routes to their destinations. When determining the new timetable and rolling stock schedule, the railway operator has to take passenger behavior into account. The operator should increase the capacity of trains for which the operator expects more demand than on a regular day. Furthermore, the operator could increase the frequency of the trains that serve stations with an additional demand.This paper describes a real-time disruption management approach which integrates the rescheduling of the rolling stock and the timetable by taking the changed passenger demand into account. The timetable decisions are limited to additional stops of trains at stations at which they normally would not call. Several variants of the approach are suggested, with the difference in how to determine which additional stops should be executed.Real-time rescheduling requires fast solutions. Therefore a heuristic approach is used. We demonstrate the performance of the several variants of our algorithm on realistic instances of Netherlands Railways, the major railway operator in the Netherlands.  相似文献   

4.
Knock-on delay, which is the key factor in punctuality of railway service, is mainly related to two factors including the quality of timetable in the planning phase and disturbances which may result in unscheduled trains’ waiting or meeting in operation phase. If the delay root cause and the interactions among the factors responsible for these can be clearly clarified, then the punctuality of railway operations can be enhanced by taking reactions such as timetable adjustment, rescheduling or rerouting of railway traffic in case of disturbances. These delay reasons can be used to predict the lengths of railway disruptions and effective reactions can be applied in disruption management. In this work, a delay root cause discovery model is proposed, which integrates heterogeneous railway operation data sources to reconstruct the details of the railway operations. A supervised decision tree method following the machine learning and data mining techniques is designed to estimate the key factors in knock-on delays. It discovers the root cause delay factor by logically analyzing the scheduled or un-scheduled trains meetings and overtaking behaviors, and the subsequent delay propagations. Experiment results show that the proposed decision tree can predict the delay reason with the accuracy of 83%, and it can be further enhance to 90% if the delay cause is only considered “prolonged passengers boarding” and “meeting or overtaking” factors. The delay root cause can be discovered by the proposed model, verified by frequency filtering in operation records, and resolved by the adjustment of timetable which is an important reference for the next timetable rescheduling. The results of this study can be applied to railway operation decision support and disruption management, especially with regard to timetable rescheduling, trains resequencing or rerouting, system reliability analysis, and service quality improvements.  相似文献   

5.
Railway traffic is heavily affected by disturbances and/or disruptions, which are often cause of delays and low performance of train services. The impact and the propagation of such delays can be mitigated by relying on automatic tools for rescheduling traffic in real-time. These tools predict future track conflict based on current train information and provide suitable control measures (e.g. reordering, retiming and/or rerouting) by using advanced mathematical models. A growing literature is available on these tools, but their effects on real operations are blurry and not yet well known, due to the very scarce implementation of such systems in practice.In this paper we widen the knowledge on how automatic real-time rescheduling tools can influence train performance when interfaced with railway operations. To this purpose we build up a novel traffic control framework that couples the state-of-the art automatic rescheduling tool ROMA, with the realistic railway traffic simulation environment EGTRAIN, used as a surrogate of the real field. At regular times ROMA is fed with current traffic information measured from the field (i.e. EGTRAIN) in order to predict possible conflicts and compute (sub) optimal control measures that minimize the max consecutive delay on the network. We test the impact of the traffic control framework based on different types of interaction (i.e. open loop, multiple open loop, closed loop) between the rescheduling tool and the simulation environment as well as different combinations of parameter values (such as the rescheduling interval and prediction horizon). The influence of different traffic prediction models (assuming e.g. aggressive versus conservative driving behaviour) is also investigated together with the effects on traffic due to control delays of the dispatcher in implementing the control measures computed by the rescheduling tool.Results obtained for the Dutch railway corridor Utrecht–Den Bosch show that a closed loop interaction outperforms both the multiple open loop and the open loop approaches, especially with large control delays and limited information on train entrance delays and dwell times. A slow rescheduling frequency and a large prediction horizon improve the quality of the control measure. A limited control delay and a conservative prediction of train speed help filtering out uncertain traffic dynamics thereby increasing the effectiveness of the implemented measures.  相似文献   

6.
Optimal rail network infrastructure and rolling stock utilization can be achieved with use of different scheduling tools by extensive planning a long time before actual operations. The initial train timetable takes into account possible smaller disturbances, which can be compensated within the schedule. Bigger disruptions, such as accidents, rolling stock breakdown, prolonged passenger boarding, and changed speed limit cause delays that require train rescheduling. In this paper, we introduce a train rescheduling method based on reinforcement learning, and more specifically, Q-learning. We present here the Q-learning principles for train rescheduling, which consist of a learning agent and its actions, environment and its states, as well as rewards. The use of the proposed approach is first illustrated on a simple rescheduling problem comprising a single-lane track with three trains. The evaluation of the approach is performed on extensive set of experiments carried out on a real-world railway network in Slovenia. The empirical results show that Q-learning lead to rescheduling solutions that are at least equivalent and often superior to those of several basic rescheduling methods that do not rely on learning agents. The solutions are learned within reasonable computational time, a crucial factor for real-time applications.  相似文献   

7.
Railway transportation provides sustainable, fast and safe transport. Its attractiveness is linked to a broad concept of service reliability: the capability to adhere to a timetable in the presence of delays perturbing traffic. To counter these phenomena, real-time rescheduling can be used, changing train orders and times, according to rules of thumb, or mathematical optimization models, minimizing delays or maximizing punctuality. In the literature, different indices of robustness, reliability and resilience are defined for railway traffic. We review and evaluate these indices applied to railway traffic control, comparing optimal rescheduling approaches such as Open Loop and Closed Loop control, to a typical First-Come-First-Served dispatching rule, and following the timetable (no-action). This experimental analysis clarifies the benefits of automated traffic control for infrastructure managers, railway operators and passengers. The timetable order, normally used in assessing a-priori reliability, systematically overestimates unreliability of operations that can be reduced by real-time control.  相似文献   

8.
An expert system for the air traffic flow management (ATFM) problem is presented. Two main prototypes have been constructed, one for timetable rescheduling that attempts to modify airline timetables to smooth traffic peaks at airports during rush-hours and another for centralized flow control that works to forecast the place, time and magnitude of the congestion and to propose mitigative actions. Simulations for the Brazilian ATFM, including the principal 14 airports, show the potential usefulness of the expert system.  相似文献   

9.
We propose a branch-and-price approach for solving the integer multicommodity flow model for the network-level train unit scheduling problem (TUSP). Given a train operator’s fixed timetable and a fleet of train units of different types, the TUSP aims at determining an assignment plan such that each train trip in the timetable is appropriately covered by a single or coupled train units. The TUSP is challenging due to its complex nature. Our branch-and-price approach includes a branching system with multiple branching rules for satisfying real-world requirements that are difficult to realize by linear constraints, such as unit type coupling compatibility relations and locations banned for coupling/decoupling. The approach also benefits from an adaptive node selection method, a column inheritance strategy and a feature of estimated upper bounds with node reservation functions. The branch-and-price solver designed for TUSP is capable of handling instances of up to about 500 train trips. Computational experiments were conducted based on real-world problem instances from First ScotRail. The results are satisfied by rail practitioners and are generally competitive or better than the manual ones.  相似文献   

10.
In a heavily congested metro line, unexpected disturbances often occur to cause the delay of the traveling passengers, infeasibility of the current timetable and reduction of the operational efficiency. Due to the uncertain and dynamic characteristics of passenger demands, the commonly used method to recover from disturbances in practice is to change the timetable and rolling stock manually based on the experiences and professional judgements. In this paper, we develop a stochastic programming model for metro train rescheduling problem in order to jointly reduce the time delay of affected passengers, their total traveling time and operational costs of trains. To capture the complexity of passenger traveling characteristics, the arriving ratio of passengers at each station is modeled as a non-homogeneous poisson distribution, in which the intensity function is treated as time-varying origin-to-destination passenger demand matrices. By considering the number of on-board passengers, the total energy usage is modeled as the difference between the tractive energy consumption and the regenerative energy. Then, we design an approximate dynamic programming based algorithm to solve the proposed model, which can obtain a high-quality solution in a short time. Finally, numerical examples with real-world data sets are implemented to verify the effectiveness and robustness of the proposed approaches.  相似文献   

11.
In this paper, we develop a new framework for strategic planning purposes to calculate railway infrastructure occupation and capacity consumption in networks, independent of a timetable. Furthermore, a model implementing the framework is presented. In this model different train sequences are generated and assessed to obtain timetable independence. A stochastic simulation of delays is used to obtain the capacity consumption. The model is tested on a case network where four different infrastructure scenarios are considered. Both infrastructure occupation and capacity consumption results are obtained efficiently with little input. The case illustrates the model’s ability to quantify the capacity gain from infrastructure scenario to infrastructure scenario which can be used to increase the number of trains or improve the robustness of the system.  相似文献   

12.
Unexpected disruptions occur for many reasons in railway networks and cause delays, cancelations, and, eventually, passenger inconvenience. This research focuses on the railway timetable rescheduling problem from a macroscopic point of view in case of large disruptions. The originality of our approach is to integrate three objectives to generate a disposition timetable: the passenger satisfaction, the operational costs and the deviation from the undisrupted timetable. We formulate the problem as an Integer Linear Program that optimizes the first objective and includes ε-constraints for the two other ones. By solving the problem for different values of ε, the three-dimensional Pareto frontier can be explored to understand the trade-offs among the three objectives. The model includes measures such as canceling, delaying or rerouting the trains of the undisrupted timetable, as well as scheduling emergency trains. Furthermore, passenger flows are adapted dynamically to the new timetable. Computational experiments are performed on a realistic case study based on a heavily used part of the Dutch railway network. The model is able to find optimal solutions in reasonable computational times. The results provide evidence that adopting a demand-oriented approach for the management of disruptions not only is possible, but may lead to significant improvement in passenger satisfaction, associated with a low operational cost of the disposition timetable.  相似文献   

13.
The train trajectory optimization problem aims at finding the optimal speed profiles and control regimes for a safe, punctual, comfortable, and energy-efficient train operation. This paper studies the train trajectory optimization problem with consideration of general operational constraints as well as signalling constraints. Operational constraints refer to time and speed restrictions from the actual timetable, while signalling constraints refer to the influences of signal aspects and automatic train protection on train operation. A railway timetable provides each train with a train path envelope, which consists of a set of positions on the route with a specified target time and speed point or window. The train trajectory optimization problem is formulated as a multiple-phase optimal control model and solved by a pseudospectral method. This model is able to capture varying gradients and speed limits, as well as time and speed constraints from the train path envelope. Train trajectory calculation methods under delay and no-delay situations are discussed. When the train follows the planned timetable, the train trajectory calculation aims at minimizing energy consumption, whereas in the case of delays the train trajectory is re-calculated to track the possibly adjusted timetable with the aim of minimizing delays as well as energy consumption. Moreover, the train operation could be affected by yellow or red signals, which is taken into account in the train speed regulation. For this purpose, two optimization policies are developed with either limited or full information of the train ahead. A local signal response policy ensures that the train makes correct and quick responses to different signalling aspects, while a global green wave policy aims at avoiding yellow signals and thus proceed with all green signals. The method is applied in a case study of two successive trains running on a corridor with various delays showing the benefit of accurate predictive information of the leading train on energy consumption and train delay of the following train.  相似文献   

14.
Timetable design is crucial to the metro service reliability. A straightforward and commonly adopted strategy in daily operation is a peak/off-peak-based schedule. However, such a strategy may fail to meet dynamic temporal passenger demand, resulting in long passenger waiting time at platforms and over-crowding in trains. Thanks to the emergence of smart card-based automated fare collection systems, we can now better quantify spatial–temporal demand on a microscopic level. In this paper, we formulate three optimization models to design demand-sensitive timetables by demonstrating train operation using equivalent time (interval). The first model aims at making the timetable more dynamic; the second model is an extension allowing for capacity constraints. The third model aims at designing a capacitated demand-sensitive peak/off-peak timetable. We assessed the performance of these three models and conducted sensitivity analyzes on different parameters on a metro line in Singapore, finding that dynamical timetable built with capacity constraints is most advantageous. Finally, we conclude our study and discuss the implications of the three models: the capacitated model provides a timetable which shows best performance under fixed capacity constraints, while the uncapacitated model may offer optimal temporal train configuration. Although we imposed capacity constraints when designing the optimal peak/off-peak timetable, its performance is not as good as models with dynamical headways. However, it shows advantages such as being easier to operate and more understandable to the passengers.  相似文献   

15.
Activity scheduling simulation models represent an emerging and proposing approach to forecasting travel demand. The most significant developmental challenge is the lack of empirical data on how people actually proceed through the scheduling and conflict resolution process. This paper develops a new methodology to collect data about the rescheduling decision process. The data collection involves six stages: preplanned schedule interview, coding of the preplanned schedule, second-by-second Global Positioning System tracking, internet-based prompted recall diary, detection of rescheduling decisions (via comparison of planned versus executed activities), and a final in-depth interview probing the how and why of rescheduling decisions. Each stage of the methodology is described in detail with example results drawn from a pilot study. Key discoveries include: elicitation of multiple preplanned schedule reporting methods (verbal, point-form, calendar); discovery that activity attributes (time, location, involved persons) are planned on significantly different time horizons and include partial elaboration; and provision of new insights into how and why rescheduling decisions are made. A method for automatically tracking rescheduling decisions was also discovered. Overall, the new methodology has potential to contribute to the development of more realistic models of the entire scheduling process, especially rescheduling and conflict resolution sub-models.  相似文献   

16.
This paper presents a model-based multiobjective control strategy to reduce bus bunching and hence improve public transport reliability. Our goal is twofold. First, we define a proper model, consisting of multiple static and dynamic components. Bus-following model captures the longitudinal dynamics taking into account the interaction with the surrounding traffic. Furthermore, bus stop operations are modeled to estimate dwell time. Second, a shrinking horizon model predictive controller (MPC) is proposed for solving bus bunching problems. The model is able to predict short time-space behavior of public transport buses enabling constrained, finite horizon, optimal control solution to ensure homogeneity of service both in time and space. In this line, the goal with the selected rolling horizon control scheme is to choose a proper velocity profile for the public transport bus such that it keeps both timetable schedule and a desired headway from the bus in front of it (leading bus). The control strategy predicts the arrival time at a bus stop using a passenger arrival and dwell time model. In this vein, the receding horizon model predictive controller calculates an optimal velocity profile based on its current position and desired arrival time. Four different weighting strategies are proposed to test (i) timetable only, (ii) headway only, (iii) balanced timetable - headway tracking and (iv) adaptive control with varying weights. The controller is tested in a high fidelity traffic simulator with realistic scenarios. The behavior of the system is analyzed by considering extreme disturbances. Finally, the existence of a Pareto front between these two objectives is also demonstrated.  相似文献   

17.
This paper documents a fuzzy-logic-based incident detection algorithm for signalized urban diamond interchanges. The model is capable of detecting lane-blocking incidents whose effects are manifested by patterns of deterioration in traffic conditions that require adjustments in signal control strategies. As a component of a real-time traffic adaptive control system for signalized diamond interchanges, the algorithm feeds an incident report (i.e., the time, location, and severity of the incident) to the system's optimization manager, which uses that information to determine the appropriate signal control strategy.The performance of the model was studied using a simulation of an actual diamond interchange. The simulation study evaluated the model's performance in terms of detection rate, false alarm rate, and mean time to detect. The model's performance was encouraging, and the fuzzy-logic-based approach is considered promising.  相似文献   

18.
With the increasing demand for railway transportation infrastructure managers need improved automatic timetabling tools that provide feasible timetables with enhanced performance in short computation times. This paper proposes a hierarchical framework for timetable design which combines a microscopic and a macroscopic model of the network. The framework performs an iterative adjustment of train running and minimum headway times until a feasible and stable timetable has been generated at the microscopic level. The macroscopic model optimizes a trade-off between minimal travel times and maximal robustness using an Integer Linear Programming formulation which includes a measure for delay recovery computed by an integrated delay propagation model in a Monte Carlo setting. The application to an area of the Dutch railway network shows the ability of the approach to automatically compute a feasible, stable and robust timetable. Practitioners can use this approach both for effective timetabling and post-evaluation of existing timetables.  相似文献   

19.
In scheduled railway traffic networks a single delayed train may cause a domino effect of secondary delays over the entire network, which is a main concern to planners and dispatchers. This paper presents a model and an algorithm to compute the propagation of initial delays over a periodic railway timetable. The railway system is modelled as a linear system in max-plus algebra including zero-order dynamics corresponding to delay propagation within a timetable period. A timed event graph representation is exploited in an effective graph algorithm that computes the propagation of train delays using a bucket implementation to store the propagated delays. The behaviour of the delay propagation and the convergence of the algorithm is analysed depending on timetable properties such as realisability and stability. Different types of delays and delay behaviour are discussed, including primary and secondary delays, structural delays, periodic delay regimes, and delay explosion. A decomposition method based on linearity is introduced to deal with structural and initial delays separately. The algorithm can be applied to large-scale scheduled railway traffic networks in real-time applications such as interactive timetable stability analysis and decision support systems to assist train dispatchers.  相似文献   

20.
This paper presents a fuel efficient control strategy for a group of connected hybrid electric vehicles (HEVs) in urban road conditions. A hierarchical control architecture is proposed in this paper for every HEV, where the higher level and the lower level controller share information with each other and solve two different problems that aim at improving its fuel efficiency. The higher level controller of each HEV is considered to utilize traffic light information, through vehicle to infrastructure (V2I) communication, and state information of the vehicles in its near neighborhood, via vehicle to vehicle (V2V) communication. Apart from that, the higher level controller of each HEV uses the recuperation information from the lower level controller and provides it the optimal velocity profile by solving its problem in a model predictive control framework. Each lower level controller uses adaptive equivalent consumption minimization strategy (ECMS) for following their velocity profiles, obtained from the higher level controller, in a fuel efficient manner. In this paper, the vehicles are modeled in Autonomie software and the simulation results are provided in the paper that shows the effectiveness of the proposed control architecture.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号