排序方式: 共有98条查询结果,搜索用时 15 毫秒
1.
由于盾构法施工与浅埋矿山法相比,具有速度快、质量好、安全环保、对地面干扰较小等优点,已经得到广泛的认可和应用.通过对吊装孔预埋件抗拔试验方法的初步探索,提出简单实用的抗拔试验方法,对实际工作有一定得指导意义. 相似文献
2.
3.
Zhendong Liu Per-Anders Jönsson Sebastian Stichel Anders Rønnquist 《Vehicle System Dynamics: International Journal of Vehicle Mechanics and Mobility》2016,54(8):1077-1097
The contact between pantograph and catenary at high speeds suffers from high dynamic contact force variation due to stiffness variations and wave propagation. To increase operational speed on an existing catenary system, especially for soft catenary systems, technical upgrading is usually necessary. Therefore, it is desirable to explore a more practical and cost-saving method to increase the operational speed. Based on a 3D pantograph–catenary finite element model, a parametric study on two-pantograph operation with short spacing distances at high speeds shows that, although the performance of the leading pantograph gets deteriorated, the trailing pantograph feels an improvement if pantographs are spaced at a proper distance. Then, two main positive effects, which can cause the improvement, are addressed. Based on a discussion on wear mechanisms, this paper suggests to use the leading pantograph as an auxiliary pantograph, which does not conduct any electric current, to minimise additional wear caused by the leading pantograph. To help implementation and achieve further improvement under this working condition, this paper investigates cases with optimised uplift force on the leading pantograph and with system parameter deviations. The results show that the two positive effects still remain even with some system parameter deviations. About 30% of speed increase should be possibly achieved still sustaining a good dynamic performance with help of the optimised uplift force. 相似文献
4.
新建安九铁路鳊鱼洲长江大桥采用两线350 km/h高铁及两线200 km/h客货共线标准建设。南汊航道桥采用主跨672 m双塔钢箱混合梁交叉索斜拉桥,北汊航道桥采用主跨2×140 m独塔竖琴式预应力混凝土梁斜拉桥,鳊鱼洲及北汊非通航孔区采用48 m简支梁桥,跨北岸大堤采用主跨100 m变高连续梁桥,南、北岸引桥除连续梁外均采用32 m、24 m铁路标准梁,基础均采用桩基础。其中南、北汊航道桥采用整幅修建,其余采用分幅修建。桥址区基岩为灰岩,岩溶发育,设计采用了预注浆及抛填片石粘土法或灌注低标号片石混凝土措施进行处理。 相似文献
5.
《铁道标准设计通讯》2016,(8):45-49
以某码头交通联络线的CFG桩复合地基为工程背景,开展浅埋基岩复合地基的加固机理研究,采用ABAQUS软件分析CFG桩端距基岩距离、嵌岩深度和下伏岩性等不同工况对浅埋基岩复合地基的承载效果。结果表明,浅埋基岩的CFG桩复合地基的承载主要由桩体承担,但桩间土也能承担部分荷载;距基岩距离越小,桩顶处出现的沉降量越小,桩顶处桩土应力比越大;嵌岩深度越大,沉降量也越小,而桩顶处桩土应力比越大;下部基岩弹性模量越大,沉降量越小,桩顶处的桩土应力越大。 相似文献
6.
7.
在大直径泥水盾构施工中,由于大断面隧道所承受的浮力大和泥水对浆液的稀释及通过富水复合地层等不利条件,同步注浆效果大受影响.本文结合正在施工的盾构隧道施工情况进行研究分析,通过对盾构原有注浆设备和管路优化改造,由传统的同步注入单液水泥砂浆改造为同步注入复合浆液,达到了同步注入速凝浆液的目的,并通过在施工中加强过程控制和采取辅助措施,解决了因同步注浆效果差造成的管片上浮及开裂等技术难题,取得了很好的效果. 相似文献
8.
9.
文章考虑了土体力学特性,以及桩身材料性质、桩长与桩径(含扩底直径)、桩顶埋深、桩顶卸载与加载、群桩效应等诸多因素的影响,结合工程经验给出了计算扩底抗拔桩极限承载力的半经验半理论方法;根据扩底抗拔桩破坏面位置不同,将扩底抗拔桩破坏模式分为三类(即破坏面延伸至地表的整体剪切破坏、破坏面介于地表与扩孔段之间的局部剪切破坏与破坏面位于扩孔段附近的冲剪破坏),推导出了整体剪切破坏模式的极限平衡状态方程;并依据扩底抗拔桩轴对称条件与土体抗拉强度小的力学特征,给出了求解整体破坏面的微分筒数值解法;利用经验法估算了局部剪切破坏、冲剪破坏模式下的端阻力,进而给出了任意土层中扩底抗拔桩承载力计算步骤与方法;最后,结合一足尺试验的计算分析与承载力测试比较,验证了计算方法的可靠性与精确度。 相似文献
10.
外海深水裸露基岩大直径嵌岩桩套筒稳桩技术 总被引:1,自引:1,他引:0
结合马迹山港大直径嵌岩桩稳桩的施工实践,简要介绍了深水裸露基岩大直径嵌岩桩钢套筒稳桩施工技术,即利用一定厚度的人造基床来满足嵌岩桩钢套筒施工期的稳定要求。为避免人造基床对码头前沿水深的影响,码头前排桩采用人造基床与挑梁相结合的稳桩工艺。 相似文献