排序方式: 共有3条查询结果,搜索用时 471 毫秒
1
1.
为了解决由于单护盾TBM掘进刀盘扭矩过大或盾体姿态发生偏差时,管片在掘进过程中产生旋转,造成管片安装精度、外观质量及运输效率受到影响等问题,结合单护盾TBM在软岩地层掘进条件下,分析管片旋转产生的原因,针对刀盘等设备的结构进行设计改进、优化掘进参数、优选刀具类型、及时清理刀盘以及必要时采取牺牲管片环缝与纵缝等措施,最终解决了单护盾TBM掘进过程中管片旋转的施工难题。 相似文献
2.
3.
No. 2 ventilation shaft of Kuocangshan tunnel on Zhuji Yongjia expressway has complex geologic condition, many construction difficulties and short construction schedule. In order to complete the project on time, the construction technology of "muck dropping shaft sinking and secondary enlarging excavation" is selected for the sinking of the shaft from several shaft sinking methods, including conventional one time shaft sinking method, "muck dropping shaft sinking and secondary enlarging excavation" method and raise boring method. The selected construction technology is presented in this paper. This technology not only achieves good results in construction schedule, construction safety and construction quality, but also reduces the construction cost. 相似文献
1