首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
综合类   1篇
  2011年   1篇
排序方式: 共有1条查询结果,搜索用时 109 毫秒
1
1.
The paper is aimed at developing an optimized design of the pantograph and catenary system with double pantographs at a speed of 350 km/h for the Wuhan-Guangzhou high-speed railway.First,the pantograph and catenary system for the Beijing-Tianjin high-speed railway was analyzed to verify whether its design objective could be fulfilled.It shows that the system is not able to satisfy the requirement of a sustainable running speed of 350 km/h.Then a new scheme for the pantograph and catenary system is proposed ...  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号