排序方式: 共有174条查询结果,搜索用时 15 毫秒
1.
2.
余金海 《铁路工程造价管理》2012,27(4):27-29
采用初步设计文件进行施工招投标的铁路建设项目,目前大部分正处于概算清理阶段。概算清理是针对采用初步设计文件进行施工招投标特别增加的一项投资管理措施,他涉及到施工图投资检算、变更设计、征地拆迁及价差调整、其他政策性费用调整等,政策性强、工作量大。此文针对施工总价承包招标文件范本的有关条款,就概算清理原则、施工图投资检算的编制、价差调整等进行论述与分析,并提出建议与计算方法,为实际工程概算清理提供借鉴。 相似文献
3.
赵汉 《铁路工程造价管理》2012,27(1):37-39
结合我国铁路"走出去"项目概预算编制工作,阐述编制我国周边国家铁路建设项目概预算时应注意坚持的几点原则。"走出去"项目概预算编制应注意的问题为,先将其视为国内项目编制概预算,再进行国外人工费调整,以及材料费(直发料、厂发料、当地料、燃油料)、运价、取费调查,在掌握基础资料的基础上,通过对工料机资料的综合分析,合理确定综合单价、取费标准等,使编制的投资概算全面、科学、合理,真实反映项目的造价水平。 相似文献
4.
ABSTRACTIn this article, we propose a new model called subjective-utility travel time budget (SU-TTB) model to capture travelers' risk-averse route choices. In the travel time budget (TTB) and mean-excess travel time (METT) model, a predefined confidence level is needed to capture the risk-aversion in route choice. Due to the day-to-day route travel time variations, the exact confidence level is hard to be predicted. With the SU-TTB model, we assume travelers' confidence level belongs to an interval that they may comply with in the route choice. The two main components of SU-TTB are the utility function and the TTB model. We can show that the SU-TTB can be reduced to the TTB and METT model with proper utility function for the confidence levels. We can also prove its equivalence with our recently proposed nonlinear-expectation route travel time (NERTT) model in some cases and give some new interpretation on the NERTT with this equivalence. Finally, we formulate the SU-TTB model as a variational inequality (VI) problem to model the risk-averse user equilibrium (RAUE), termed as generalized RAUE (GRAUE). The GRAUE is solved via a heuristic gradient projection algorithm, and the model and solution algorithm are demonstrated with the Braess's traffic network and the Nguyen and Dupuis's traffic network. 相似文献
5.
全面预算是企业提升管理水平的重要工具,建立与完善科学的全面预算管理体系,是企业经营目标得以实现的重要环节。基于上述认识,作者以某勘察设计企业(以下简称某企业)为例,通过对其全面预算管理现状分析,结合国内外先进的预算管理理论和思想,通过健全全面预算管理组织机构,完善制度建设,确立科学合理的预算目标,引进信息化管理手段,完善全面预算管理监督控制与考核机制等,对其全面预算管理工作进行了全面优化。 相似文献
6.
裴老女 《内蒙古公路与运输》2007,(6)
作为设计概算,施工图预算编制人员,概预算的合理性、可靠性及准确性对投资决策、费用控制、招投标工作将产生重要影响,而根据施工图计算工程量的准确程度又直接影响概预算编制质量。工作实践中,遵循必要程序,严格计算重点是必要而有效手段,可准确计算工程量,进而确保概预算编制精度。即科学进行工程量计算,做到不重不漏是提高概预算编制质量的保障。 相似文献
7.
全面预算管理在国内外企业中得到了广泛应用。勘察设计单位改制后,也纷纷引入全面预算管理。该文探讨全面预算管理在勘察设计单位中的应用过程,并提出在实施过程容易出现的问题及解决对措。 相似文献
8.
Silicon dynamics in the Oder estuary, Baltic Sea 总被引:1,自引:0,他引:1
Marianna Pastuszak Daniel J. Conley Christoph Humborg Zbigniew Witek Stanisaw Sitek 《Journal of Marine Systems》2008,73(3-4):250
Studies on dissolved silicate (DSi) and biogenic silica (BSi) dynamics were carried out in the Oder estuary, Baltic Sea in 2000–2005. The Oder estuary proved to be an important component of the Oder River–Baltic Sea continuum where very intensive seasonal DSi uptake during spring and autumn, but also BSi regeneration during summer take place. Owing to the regeneration process annual DSi patterns in the river and the estuary distinctly differed; the annual patterns of DSi in the estuary showed two maxima and two minima in contrast to one maximum- and one minimum-pattern in the Oder River. DSi concentrations in the river and in the estuary were highest in winter (200–250 μmol dm− 3) and lowest (often less than 1 μmol dm− 3) in spring, concomitant with diatom growth; such low values are known to be limiting for new diatom growth. Secondary DSi summer peaks at the estuary exit exceeded 100 μmol dm− 3, and these maxima were followed by autumn minima coinciding with the autumn diatom bloom. Seasonal peaks in BSi concentrations (ca. 100 μmol dm− 3) occurred during the spring diatom bloom in the Oder River. Mass balance calculations of DSi and BSi showed that DSi + BSi import to the estuary over a two year period was 103.2 kt and that can be compared with the DSi export of 98.5 kt. The difference between these numbers gives room for ca. 2.5 kt BSi to be annually exported to the Baltic Sea. Sediment cores studies point to BSi annual accumulation on the level of 2.5 kt BSi. BSi import to the estuary is on the level of ca. 10.5 kt, thus ca. 5 kt of BSi is annually converted into the DSi, increasing the pool of DSi that leaves the system. BSi concentrations being ca. 2 times higher at the estuary entrance than at its exit remain in a good agreement with the DSi and BSi budgeting presented in the paper. 相似文献
9.
吴宗忠 《内蒙古公路与运输》2013,(5):30-32
公路工程建设管理中如何控制好工程投资,合理利用建设资金,以最少的资金投入获得最大的社会经济效益,确保工程建设投资不超出概预算,是工程造价投资控制管理的突出问题.文章从工程造价超概预算原因、审查控制要点及途径方法对工程造价管理中概预算审查工作细节控制等方面进行了分析与探讨. 相似文献
10.
林旭茹 《铁路工程造价管理》2011,26(2):33-34
铁路工程概预算审核是控制工程造价、提高投资效益的重要手段。结合铁路项目概预算审核工作的实践,总结归纳出铁路工程概预算审核工作的重点为:审核概预算的编制依据,审核概预算工程量,审核定额子目的套用,审核设备、材料的预算价格和相关取费标准,并做好造价指标的对比分析工作,提高审核工作的质量和效率。 相似文献