风积沙地层大跨公路隧道施工过程力学行为分析
引用本文:仇玉良,姚红志,胡晓勇,郑万坤,史宝童.风积沙地层大跨公路隧道施工过程力学行为分析[J].中国公路学报,2012,25(3):112-119.
作者姓名:仇玉良  姚红志  胡晓勇  郑万坤  史宝童
作者单位:1. 北京交通大学土木建筑工程学院,北京100044 中交第一公路勘察设计研究院有限公司,陕西西安710075
2. 中交第一公路勘察设计研究院有限公司,陕西西安,710075
基金项目:国家自然科学基金项目(51178052);中国交通建设集团重点科技研发项目(2007-ZJKJ-A-08)
摘    要:采用三维数值模拟和现场监测的手段,对风积沙地层大跨公路隧道超前支护效果、工法参数优化、围岩压力释放和沉降发展规律进行分析。通过计算结果与监测数据的对比分析,得出了风积沙地层隧道开挖过程中围岩压力的变化形态、二次衬砌施作时机和最终形变荷载大小以及沉降发展等规律。分析结果表明:旋喷桩超前支护将掌子面潜在失稳区域控制在旋喷壳下部掌子面前方D/2范围(D为单洞开挖跨度14m);三台阶法施工台阶长度宜取(1/3~1/2)D;二次衬砌落后下台阶掌子面的距离宜取D/2;二次衬砌分担荷载较大,分担比例约为50%。

关 键 词:隧道工程  风积沙隧道  三维数值模拟  旋喷桩  台阶长度  荷载释放  沉降

Mechanical Behavior in the Construction of Large Span Highway Tunnel in Aeolian Sand Strata
QIU Yu-liang,YAO Hong-zhi,HU Xiao-yong,ZHENG Wan-kun,SHI Bao-tong.Mechanical Behavior in the Construction of Large Span Highway Tunnel in Aeolian Sand Strata[J].China Journal of Highway and Transport,2012,25(3):112-119.
Authors:QIU Yu-liang  YAO Hong-zhi  HU Xiao-yong  ZHENG Wan-kun  SHI Bao-tong
Institution:1.School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China; 2.CCCC First Highway Consultants Co.,Ltd,Xi’an 710075,Shaanxi,China)
Abstract:The effect of advanced support,parameters optimization of construction method,rules of surrounding rock pressure release and settlement development were analyzed via three-dimensional numerical simulation and in-situ monitoring to study mechanical behavior in the construction of large span highway tunnel in aeolian sand strata.Surrounding rock pressure changing shape,timing of secondary lining construction,ultimate deformation load and settlement development rules during tunnel excavation in aeolian sand strata were figured out by contrastive analysis of numerical values and field monitoring values.The results show that advanced support with chemical churning pile limits potential instability area of tunnel working face to D/2 under the shell of piles(D is the excavation span of tunnel,D=14 m).Three-bench method of construction should take the bench length of(1/3-1/2)D,the distance of secondary lining behind the working face of the bottom step should be D/2.The secondary lining bears about 50% of external pressure.
Keywords:tunnel engineering  aeolian sand tunnel  three-dimensional simulation  chemical churning pile  bench length  load release  settlement