首页 | 本学科首页   官方微博 | 高级检索  
     检索      

某双洞八车道隧道小净距优化的数值分析
引用本文:周惠.某双洞八车道隧道小净距优化的数值分析[J].中南公路工程,2014(3):179-183.
作者姓名:周惠
作者单位:湖南省交通规划勘察设计院,湖南长沙410008
摘    要:以某双洞八车道小净距隧道为依托,从中间岩柱塑性区域、后行洞对先行洞位移及内力的影响等几个方面,探讨了各种围岩级别下四车道小净距隧道的最小净距的合理取值,对超大断面隧道的设计有一定的借鉴意义。

关 键 词:八车道  小净距  塑性区域  位移及内力  合理取值

The Numerical Analysis about the Optimization of Small Clear Distance in a Double Hole Eight-lanes Tunnel
ZHOU Hui.The Numerical Analysis about the Optimization of Small Clear Distance in a Double Hole Eight-lanes Tunnel[J].Central South Highway Engineering,2014(3):179-183.
Authors:ZHOU Hui
Institution:ZHOU Hui (Hunan Provincial Communications Planning, Survey & Desion Institure, Changsha, Hunan 410008, China)
Abstract:This paper is based on small interval tunnel of eight lanes, According to the middle rock pillars plastic area and the influence which the first hole impact on after hole in displacement and in- ternal force, it discusses the reasonable value minimum interval under four lanes and small clear distance tunnel in various levels of surrounding rock. This paper have certain reference significance in design of large cross section tunnel.
Keywords:eight lanes  small clear distance  plastic zone  displacement and internal force  areasonable value
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号