首页 | 本学科首页   官方微博 | 高级检索  
     检索      

国道324线澄海外砂大桥改建工程T梁的吊装
引用本文:陈秋盛,万绵达.国道324线澄海外砂大桥改建工程T梁的吊装[J].筑路机械与施工机械化,2006,23(11):39-40,43.
作者姓名:陈秋盛  万绵达
作者单位:汕头公路桥梁工程总公司,广东,汕头,515041
摘    要:国道324线澄海外砂大桥工程属旧桥改建,行车干扰大,且预制场地狭小,严重影响和制约T梁的吊装施工。分析了半跨龙门吊的设计安装要点,着重介绍了T梁的吊装施工组织方案、施工方法及安全技术保证措施。

关 键 词:T梁  半跨龙门吊  吊装施工  安全措施
文章编号:1000-033X(2006)11-0039-02
收稿时间:2006-02-04
修稿时间:2006-02-04

Hoisting of T-shaped Beam of Bridge in 324 National Road
CHEN Qiu-sheng,WAN Mian-da.Hoisting of T-shaped Beam of Bridge in 324 National Road[J].Road Machinery & Construction Mechanization,2006,23(11):39-40,43.
Authors:CHEN Qiu-sheng  WAN Mian-da
Abstract:The T-shaped beam hoisting is influenced and restricted because of traffic flow disturb and narrow prefabricating site. The points of hoisting design of semi-span gantry crane are analyzed. The construction schemes, methods and safety of T-shaped beam hoisting are introduced.
Keywords:T-shaped beam  semi-span gantry crane  hoisting construction  safety measure
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号