前板桩后低桩承台结构在板桩码头改造中的应用
引用本文:蒋国栋,张 颖,罗天一.前板桩后低桩承台结构在板桩码头改造中的应用[J].水运工程,2016(7):46-50.
作者姓名:蒋国栋  张 颖  罗天一
作者单位:中交四航局港湾工程设计院有限公司,广东 广州 510290,中交四航局港湾工程设计院有限公司,广东 广州 510290,中交四航局港湾工程设计院有限公司,广东 广州 510290
摘    要:结合实际工程介绍了前板桩后低桩承台结构的应用特点,分析了在实际设计中的技术要点和注意事项。前板桩后低桩承台结构复杂,原有规范不完全适用。结合实际工程,考虑钢板桩变位不能完全复位、低桩承台卸荷等因素,进行三维数值模拟,得到了码头结构主要构件的内力,从桩基与承台连接方式等方面分析这些因素对结构的影响,从而为结构设计和优化提供了依据。

关 键 词:前板桩后低桩承台  码头改造  板桩倾斜  三维数值模拟  卸荷  桩基连接方式

Application of the front sheet-pile and offside-low pile platform structure in the reconstruction of sheet-pile wharf
JIANG Guo-dong,ZHANG Ying and LUO Tian-yi.Application of the front sheet-pile and offside-low pile platform structure in the reconstruction of sheet-pile wharf[J].Port & Waterway Engineering,2016(7):46-50.
Authors:JIANG Guo-dong  ZHANG Ying and LUO Tian-yi
Institution:Engineering Design Institute Co.,Ltd.of CCCC Fourth Harbor Engineering Co.,Ltd.,Guangzhou,510290,China,Engineering Design Institute Co.,Ltd.of CCCC Fourth Harbor Engineering Co.,Ltd.,Guangzhou,510290,China and Engineering Design Institute Co.,Ltd.of CCCC Fourth Harbor Engineering Co.,Ltd.,Guangzhou,510290,China
Abstract:Combining with practical engineering,the paper introduced the application characteristics of the front sheet-pile and offside-low pile platform,and analyzed the technical points and considerations in the actual design.The front sheet-pile and offside-low pile platform structure is complex,and the original specifications are not completely applicable.Combining with practical engineering,and considering the factors such as the unloading of low pile platform and that the deflection of steel sheet pile cannot be completely restored,it conducted the three-dimensional numerical simulation to get the internal force of the main components in the wharf structure,and analyzed the influence of these factors on the structure from the aspects such as the connection mode between pile foundation and bearing platform,which provides the basis for structural design and optimization.
Keywords:front sheet-pile and offside-low pile platform structure  wharf reconstruction  sheet-pile incline  three-dimensional numerical simulation  unloading  pile foundation connection mod