首页 | 本学科首页   官方微博 | 高级检索  
     检索      

生米大桥主桥结构施工监控
引用本文:王朝华,邓国良.生米大桥主桥结构施工监控[J].桥梁建设,2007(2):69-71,83.
作者姓名:王朝华  邓国良
作者单位:江西省恒昌市政工程有限公司,江西,南昌,330026
摘    要:南昌生米大桥为两连拱飞鸟式中承式系杆拱桥,介绍施工过程中承台大体积混凝土水化热监控、拱肋吊装合龙监控、横梁吊装监控、系杆张拉监控的内容。

关 键 词:钢管混凝土拱桥  施工监控  桥梁施工
文章编号:1003-4722(2007)02-0069-03
修稿时间:2006-12-11

Construction Monitoring of Main Bridge Structure of Shengmi Bridge
WANG Zhao-hua,DENG Guo-liang.Construction Monitoring of Main Bridge Structure of Shengmi Bridge[J].Bridge Construction,2007(2):69-71,83.
Authors:WANG Zhao-hua  DENG Guo-liang
Institution:Hengchang Municipal Engineering Co., Ltd., Jiangxi Province, Nanchang 330026, China
Abstract:The main bridge of the Shengmi Bridge in Nanchang is a two-arch half-through tied arch bridge of flying bird type.In this paper,the construction monitoring of the main bridge structure is presented,in which the monitoring of hydration heat of massive concrete for pile caps,installation and closing of arch ribs,installation of cross beams and tensioning of tie members in the construction is included.
Keywords:concrete-filled steel tube arch bridge  construction monitoring  bridge construction
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号