Abstract: | ![]() The East China Sea a DPP platform operated nearly fifteen years, the emergence of aging equipment, process system capacity changes, thus turbine power plant, thermal oil boiler and process for treatment of waste heat system appears, how to reduce energy waste, timely and effective recovery and utilization, need to solve the problem in time. Based on data analysis, field research study platform for production, waste heat recovery plan is proposed, and the cost of investment / return, finally verifies the validity of the scheme. |