首页 | 本学科首页   官方微博 | 高级检索  
     检索      

京沪高速铁路箱梁预制冬季施工技术
引用本文:李刚.京沪高速铁路箱梁预制冬季施工技术[J].铁道建筑技术,2010(11):48-50,55.
作者姓名:李刚
作者单位:中铁十九局集团公司第五工程有限公司,辽宁大连116100
摘    要:介绍了京沪高速铁路后张法预应力箱梁梁场冬季施工采取的措施。针对华北地区冬季气温在-8℃以下且风速一般较大的情况,通过对钢筋、模板、混凝土以及预应力和注浆等工序在实际操中的控制,总结了一些技术措施和取得的效果。

关 键 词:高速铁路  箱梁预制  冬季施工

On Winter Construction of Box Girder Precasting in Beijing-Shanghai High Speed Railway
Li Gang.On Winter Construction of Box Girder Precasting in Beijing-Shanghai High Speed Railway[J].Railway Construction Technology,2010(11):48-50,55.
Authors:Li Gang
Institution:Li Gang (China Railway 19^th Bureau Group Co.Ltd.,Dalian 116100,China)
Abstract:This article introduces measures taken in winter construction of post-tensioned prestress box girder yard in Beijing -Shanghai High-speed Railway.In light of winter temperature in Northern China areas which is below -8℃,and the high wind speed,controls are taken in the processes of steel,template,concrete,prestress and grouting,from which some technical measures are summarized and good effects are achieved.
Keywords:high speed railway  box girder precasting  construction in winter
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号