首页 | 本学科首页   官方微博 | 高级检索  
     检索      

固结黏土地层盾构直接破除排水板关键技术研究
引用本文:李凤远,杨延栋,许华国.固结黏土地层盾构直接破除排水板关键技术研究[J].隧道建设,2019,39(6):913-918.
作者姓名:李凤远  杨延栋  许华国
作者单位:(1. 盾构及掘进技术国家重点实验室, 河南郑州 450001; 2. 中铁隧道局集团有限公司, 广东广州 511458)
摘    要:宁波地铁5号线1期下穿高速公路路基时存在68°斜交长40 m的含塑料排水板的固结黏土地层,为研究盾构直接通过可行性、刀具选型、施工参数优化等问题,利用TBM掘进模态综合试验平台,进行了不同类型刀具、不同掘进参数的固结黏土地层排水板破除试验。研究表明: 对于含排水板的固结黏土地层,在合理选择刀具、盾构参数并优化掘进参数情况下,盾构法施工直接破除基本可行,试验为宁波地铁工程建设提供了依据,也可为类似工程设计及施工提供参考。

关 键 词:地铁盾构  固结黏土地层  排水板  破除方法  刀具优化  掘进参数  
收稿时间:2018-11-16
修稿时间:2019-04-12

Key Technologies for Shield Cutting Plastic Drainage Plate in Consolidated Clay
LI Fengyuan,YANG Yandong,XU Huaguo.Key Technologies for Shield Cutting Plastic Drainage Plate in Consolidated Clay[J].Tunnel Construction,2019,39(6):913-918.
Authors:LI Fengyuan  YANG Yandong  XU Huaguo
Institution:(1. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China; 2. China Railway Tunnel Group Co., Ltd., Guangzhou 511458, Guangdong, China)
Abstract:The shield used in Phase 1 of Ningbo Metro Line No. 5 has to cross consolidated clay with plastic drainage plates with oblique angle of 68° and length of 40 m when crossing underneath highway roadbed. The highway roadbed would settle and the shield would be jammed in case of improper treatment. In order to prove the feasibility of the shield cutting and direct crossing and study the cutter selection and parameter optimization, some experiments on drainage plate breaking of consolidated clay with different types of cutters and tunneling parameters are carried out based on TBM boring mode experimental platform. The results show that the shield direct cutting plastic drainage plate in consolidated clay is feasible under the conditions of rational cutter selection and optimal parameter settings. The experiments provide basis for the construction of Ningbo Metro has provided experimental reference, and can further provide reference for shield tunneling and design of similar projects in the future.
Keywords:metro shield  consolidated clay  drainage plate  breaking method  cutter optimization  tunneling parameter  
本文献已被 CNKI 等数据库收录!
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号