首页 | 本学科首页   官方微博 | 高级检索  
     检索      

关角特长隧道施工地质问题及成因分析
作者单位:;1.中铁第一勘察设计院集团有限公司
摘    要:关角隧道是我国目前已建成的最长铁路隧道,施工中遇到了岭脊灰岩突涌水、软弱破碎围岩变形等地质问题。通过对主要地质问题进行成因分析,归纳总结特长隧道施工地质问题的类型和特点,寻找各类问题的内在本质与机理,提高处理隧道施工地质问题的能力,推广处理复杂施工地质问题的经验,提高复杂地质条件下长大隧道施工技术水平。

关 键 词:铁路隧道  施工  突涌水  围岩变形  成因分析

Geological Problems in the Construction of Guanjiao Supper Long Tunnel and Cause Analysis
Institution:,China Railway First Survey and Design Institute Group Co.,Ltd.
Abstract:Guan Jiao tunnel is the longest railway tunnel built in our country at present. During the construction,such geological problems as water burst,soft and broken surrounding rock deformation are encountered. This article focuses on the main geological problems encountered in the construction of Guanjiao tunnel to conduct cause analysis,summarize the types and characteristics of super long tunnel construction geological problems,identify the mechanism of such problems so as to improve the ability to deal with the geological problems,promote the practices in copying with complex geological problems and improve technological levels.
Keywords:Railway tunnel  Construction  Water burst  Deformation of surrounding rock  Cause analysis
本文献已被 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号