卵石土地层盾构下穿既有建筑物施工技术
引用本文:游祖群.卵石土地层盾构下穿既有建筑物施工技术[J].铁道建筑技术,2010(8):44-47.
作者姓名:游祖群
作者单位:中铁十三局集团有限公司,长春,130033
摘    要:结合在建成都地铁通越冶金宾馆的施工,介绍了成都卵石土地层中盾构机下穿桩基础建筑物的施工经验。重点介绍了盾构下穿既有建筑物时采用的地下掘进参数控制、地面跟踪注浆、荷载转移等方法,以上方法的综合应用经验对卵石土地层中盾构的施工有着较好的借鉴意义。

关 键 词:盾构施工  既有建筑物  跟踪注浆  荷载转移

Construction Technology of Crossing Existing Buildings in Sand-pebble Layer by Shield
You Zuqun.Construction Technology of Crossing Existing Buildings in Sand-pebble Layer by Shield[J].Railway Construction Technology,2010(8):44-47.
Authors:You Zuqun
Institution:You Zuqun ( China Railway 13th Bureau Group Co. Ltd. , Changchun 130033, China)
Abstract:This article, with a combination of the construction of crossing Metallurgy Hotel of Chengdu subway, introduces the construction experience of crossing existing buildings in sand-pebble layer. It introduces the underground excavation parameter control, ground tracing grouting, and loading transfer when crossing existing buildings. The comprehensive application of the methods above can be very beneficial to other similar projects.
Keywords:shield method construction  existing buildings  tracing grouting  loading transfer
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号