首页 | 本学科首页   官方微博 | 高级检索  
     检索      

后张法50m预应力T型梁施工控制
引用本文:杨世兵,王兵.后张法50m预应力T型梁施工控制[J].交通标准化,2008(21):154-157.
作者姓名:杨世兵  王兵
作者单位:连云港市交通工程咨询监理有限公司,江苏连云港222000
摘    要:结合工程实际.从施工准备、钢绞线的力学性能、混凝土施工、施加预应力、孔道压浆等几个方面探讨后张法50m预应力T梁的施工控制方法,对同类工程的施工有一定的指导意义。

关 键 词:后张法  50m预应力  T梁  施工

Implement of 50-meter Prestressed Concrete T Beam With Post-Extensive Method
YANG Shi-bing,WANG Bing.Implement of 50-meter Prestressed Concrete T Beam With Post-Extensive Method[J].Communications Standardization,2008(21):154-157.
Authors:YANG Shi-bing  WANG Bing
Institution:(Lianyungang Transportation Engineering Consulting & Supervision Co., Ltd., Lianyungang 222000, China)
Abstract:Combining with factual engineering, it discusses construction controlling methods of 50- meter prestressed concrete T beam with post-extensive method in aspects of implement preparation, mechanics character of steel stranded wire, concrete implement, exerting pressure, press grouting and so on, it has guiding value to similar engineerings.
Keywords:post-extensive method  50-meter prestress  T beam  construction
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号