首页 | 本学科首页   官方微博 | 高级检索  
     

自营铁路接轨设计中的几个问题
引用本文:何昔银. 自营铁路接轨设计中的几个问题[J]. 现代交通技术, 2009, 6(5): 79-82
作者姓名:何昔银
作者单位:江苏省交通科学研究院,江苏南京,210017
摘    要:分析了自营铁路接轨设计中的接轨点选择、工业站与集配站的联设和分设、车辆交接作业地点的选择、车站设备配置及立交疏解等5个必须面对的问题,并提出了相应的解决方案。

关 键 词:自营铁路  接轨设计  工业站

Problems Existing in Connecting Design of Self-supporting Railway With National Trunk Line
He Xiyin. Problems Existing in Connecting Design of Self-supporting Railway With National Trunk Line[J]. Modern Transportation Technology, 2009, 6(5): 79-82
Authors:He Xiyin
Affiliation:He Xiyin (Jiangsu Transportation Research Institute, Nanjing 210017,China )
Abstract:This paper analyses several problems existing in the connection design of self-supporting railway including connection choice, station setting, choice of train joint place, device configuration and interchange untwning. And the correspording resloving methods are put forward.
Keywords:self-supporting railway  connecting design  industrial station
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《现代交通技术》浏览原始摘要信息
点击此处可从《现代交通技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号