首页 | 本学科首页   官方微博 | 高级检索  
     检索      

某高速铁路车站基坑开挖施工技术方案
引用本文:高成林.某高速铁路车站基坑开挖施工技术方案[J].交通标准化,2011(16):92-94.
作者姓名:高成林
作者单位:中铁二局第五工程有限公司,四川 德阳,618000
摘    要:介绍某高速铁路车站总体施工流程,对基坑开挖施工中的围护与抗拔桩基施工、土体加固、降水施工、土方开挖施工及围护支撑体系施工的技术方案进行探讨,分析基坑开挖及围护支撑施工安全技术措施。

关 键 词:高速铁路  车站  基坑开挖

Construction Technical Scheme for Excavation of One High-Speed Railway Station
GAO Cheng-lin.Construction Technical Scheme for Excavation of One High-Speed Railway Station[J].Communications Standardization,2011(16):92-94.
Authors:GAO Cheng-lin
Institution:GAO Cheng-lin(China Railway 2nd Bureau 5th Engineering Co.,Ltd.,Deyang 618000,China)
Abstract:The general construction procedure of one high-speed railway station is introduced.The technical scheme for excavation construction is explored,which includes the construction of enclosure protection and pullout pile,soil reinforcement,dewatering,earth excavation,and construction of enclosure protection support system.Finally,the safety measures for excavation and enclosure protection construction are analyzed.
Keywords:high-speed railway  station  excavation  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号