市政大跨径简支钢混组合梁桥总体设计
引用本文:杨荣荣.市政大跨径简支钢混组合梁桥总体设计[J].城市道桥与防洪,2024(4):74-77.
作者姓名:杨荣荣
摘    要:针对城市高架桥梁跨越横向道路常用的简支60 m大跨径槽型钢混组合梁桥,对横断面梁片数布置、不同施工方案、降低桥面板收缩徐变措施进行分析。结果表明:(1)少主梁设计相较于多主梁设计经济性更好,但跨中上翼缘板厚会增加较多。(2)设置2个临时支墩,基本可实现钢筋混凝土共同承担一期恒载的效果。(3)与少支架施工相比,整体吊装虽方便施工,但大大提高了钢材的用钢量。(4)无支架施工时,预制桥面板在90 d的存放龄期下,频遇组合可降低混凝土桥面板30%的轴向拉力。

关 键 词:钢混组合梁  MIDAS  横断面布置  施工工序
收稿时间:2023/5/4 0:00:00
修稿时间:2023/7/5 0:00:00

Overall Design of Municipal Long-span Simple-supported Steel-concrete Composite Beam Bridge
YANG Rongrong.Overall Design of Municipal Long-span Simple-supported Steel-concrete Composite Beam Bridge[J].Urban Roads Bridges & Flood Control,2024(4):74-77.
Authors:YANG Rongrong
Abstract:Aiming at the simple-supported 60 m long-span steel-concrete composite beam bridge commonly used for the urban viaduct spanning road, the layout of cross-section beam number, the different construction schemes, and the measures to reduce the shrinkage and creep of deck slab are analyzed. The result shows that the economy of few-girder design is better than that of the multi-girder design. But the thickness of top flange slab in the middle of span will increase much. 2 temporary branch piers are set up, which can basically realize the effect of steel and concrete jointly bearing the first phase of dead load. Compared with the few-support construction, the integral hoisting is easy for construction, but will greatly increase the amount of steel material. The frequent combination can reduce the 30% axial tensile force of prefabricated concrete deck slab at the storing age for 90 d in the construction without support.
Keywords:steel-concrete composite beam  MIDAS  cross-section layout  construction procedure