首页 | 本学科首页   官方微博 | 高级检索  
     检索      

全幅双柱大挑臂预应力盖梁施工支架的搭设与受力验算
引用本文:郭秀峰,裴选红.全幅双柱大挑臂预应力盖梁施工支架的搭设与受力验算[J].山西交通科技,2011(1):38-39,64.
作者姓名:郭秀峰  裴选红
作者单位:山西交通职业技术学院公路系;山西路桥第二工程有限公司;
摘    要:介绍山岭重丘区高速公路的部分桥梁因受地形限制,下部结构采用全幅双柱大挑臂预应力盖梁施工时,支架的搭设与受力验算的施工经验和建议。

关 键 词:预应力  盖梁  支架  搭设  受力  验算

The Construction Frame Erection and Loading Checking of Full-size and Double-column Great Pick Arm Prestressed Cap Beam
GUO Xiu-feng,PEI Xuan-hong.The Construction Frame Erection and Loading Checking of Full-size and Double-column Great Pick Arm Prestressed Cap Beam[J].Shanxi Science & Technology of Communications,2011(1):38-39,64.
Authors:GUO Xiu-feng  PEI Xuan-hong
Institution:GUO Xiu-feng1,PEI Xuan-hong2(1.Shanxi Vocational and Technical College of Communications,Taiyuan,Shanxi 030031,China,2.The 2nd Engineering Co.,Ltd of Shanxi Road & Bridge Group,Linfen,Shanxi 041000,China)
Abstract:The paper introduced the construction experience and advice of the construction frame erection and loading checking for prestressed cap beam.
Keywords:prestress  cap beam  frame  erection  loading  checking  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号