首页 | 本学科首页   官方微博 | 高级检索  
     

万州长江公路大桥防撞设施工程通航论证*
引用本文:余 葵,刘 洋,林 江,吴 俊,胥润生,李晓飚,舒荣龙,母德伟. 万州长江公路大桥防撞设施工程通航论证*[J]. 水运工程, 2012, 0(7): 151-155
作者姓名:余 葵  刘 洋  林 江  吴 俊  胥润生  李晓飚  舒荣龙  母德伟
作者单位:重庆交通大学西南水运工程科学研究所,重庆,400016
基金项目:交通部西部科技项目(2011318350990)
摘    要:三峡水库175 m蓄水后,万州长江公路大桥两端部分拱圈及立柱被淹没。一旦船舶失控或走偏航道碰撞拱圈和立柱,极易导致拱桥垮塌,引发极为恶劣的安全事故。针对大桥现状,创新提出了弧形水上升降式桥梁防撞装置,该装置能对拱桥易撞部位进行区域式防护,并能随水位变化而自动升降。主要通过物理模型试验并结合相关数值模拟分析拟建防撞工程建成后对桥区河段河床演变、通航净空尺度、通航水流条件以及船舶航行条件等的影响。

关 键 词:万州长江大桥  桥墩防撞装置  净空尺度  通航论证  弧形水上升降式设施

Navigation argument on anti-collision device of Wanzhou Yangtze River road bridge
YU Kui,LIU Yang,LIN Jiang,WU Jun,XU Run-sheng,LI Xiao-biao,SHU Rong-long and MU De-wei. Navigation argument on anti-collision device of Wanzhou Yangtze River road bridge[J]. Port & Waterway Engineering, 2012, 0(7): 151-155
Authors:YU Kui  LIU Yang  LIN Jiang  WU Jun  XU Run-sheng  LI Xiao-biao  SHU Rong-long  MU De-wei
Affiliation:Southwestern Hydro Engineering Research Institute for Waterway,Chongqing Jiaotong University, Chongqing 400016, China;Southwestern Hydro Engineering Research Institute for Waterway,Chongqing Jiaotong University, Chongqing 400016, China;Southwestern Hydro Engineering Research Institute for Waterway,Chongqing Jiaotong University, Chongqing 400016, China;Southwestern Hydro Engineering Research Institute for Waterway,Chongqing Jiaotong University, Chongqing 400016, China;Southwestern Hydro Engineering Research Institute for Waterway,Chongqing Jiaotong University, Chongqing 400016, China;Southwestern Hydro Engineering Research Institute for Waterway,Chongqing Jiaotong University, Chongqing 400016, China;Southwestern Hydro Engineering Research Institute for Waterway,Chongqing Jiaotong University, Chongqing 400016, China;Southwestern Hydro Engineering Research Institute for Waterway,Chongqing Jiaotong University, Chongqing 400016, China
Abstract:After the Three Gorges Reservoir storages water to 175 m,part of the arch ring of Wanzhou Yangtze River road bridge is submerged.Once the ship is out of control or goes off the channel and then collides with the arch ring,the arch bridge is easily to collapse and thus leads to accidents.Based on the current situation of the bridge,we propose arch-shape waterborne up & down anti-collision facility which will raise and fall automatically with variation of water stage.The impact of the anti-collision device on bed evolution,navigation clearance dimensiona,navigation current condition,as well as vessels’navigation condition is analyzed by physical model test and numerical simulation.
Keywords:Wanzhou Yangtze River bridge  piers’anti-collision device  clearance dimension  navigation argument  arc-shaped waterborne up & down device