湘潭湘江四大桥主墩承台大体积混凝土施工 |
| |
作者单位: | 中交四航局第一工程有限公司 广东广州510500 |
| |
摘 要: | 本文对湘潭湘江四大桥主墩承台大体积混凝土施工中的施工方法进行阐述,并对施工过程中应该注意的质量控制方法进行分析和总结。
|
关 键 词: | 承台 大体积 质量控制 湘潭四大桥 |
Mass Concrete Construction of Main Pier Abutment of the Fourth Bridge on Xiangjiang in Xiangtan |
| |
Authors: | CHEN Heng LIANG Di |
| |
Abstract: | This paper presents the construction methods of mass concrete for main pier abutment of the Fourth Bridge on Xiangjiang in Xiangtan. It analyzes and summarizes the quality control methods in the construction process. |
| |
Keywords: | abutment mass concrete quality control the Fourth Bridge in Xiangtan |
本文献已被 CNKI 等数据库收录! |