首页 | 本学科首页   官方微博 | 高级检索  
     检索      

浅谈轨道交通建设对市政污水管网系统的影响及优化措施
引用本文:徐瑛,蒋岚岚,佘步存,蔡丹新.浅谈轨道交通建设对市政污水管网系统的影响及优化措施[J].城市道桥与防洪,2013(6):129-132,15,14.
作者姓名:徐瑛  蒋岚岚  佘步存  蔡丹新
作者单位:无锡市排水公司;无锡市政设计研究院有限公司
摘    要:城市轨道交通工程是投资大、施工周期长、影响面广的综合项目。由于线路一般设在人流密集的城市建成区,且沿街道路埋地(地铁)或架空(轻轨)铺设,因此在建设期间对城市的交通、环境及市政管道的影响较大。由于地铁车站、区间等工点的覆土通常为2~6 m,占地面积大,一般采用明挖施工,这对同处于浅层地下空间的重力流污水管道的影响很大。该文通过分析轨道交通工程建设对污水管网系统迁改建设、运行等方面的影响,结合部分典型设计案例,提出优化建议及措施,可供同行参考。

关 键 词:轨道交通  污水管网系统  管道迁改  优化措施  无锡市

Elementary Discussion Impacts of Rail Transit Construction on Municipal Sewer Network System and Its Optimization Measures
Xu Ying,Jiang Lanlan,She Bucun,Cai Danxin.Elementary Discussion Impacts of Rail Transit Construction on Municipal Sewer Network System and Its Optimization Measures[J].Urban Roads Bridges & Flood Control,2013(6):129-132,15,14.
Authors:Xu Ying  Jiang Lanlan  She Bucun  Cai Danxin
Institution:Xu Ying,Jiang Lanlan,She Bucun,Cai Danxin
Abstract:An urban rail transit project is the comprehensive project with the great investment,long construction period and wide influence.The rail transit line is generally constructed in a crowded urban built-up area,and the line will be buried(metro) and overhead constructed(light rail) along the streets and roads.Therefore,it has a larger impact on the urban traffic,environment and municipal pipelines during its construction.Since the covering soil of the subway stations and the regions is usually 2 ~ 6m,and the covering area is larger,the excavation method is generally used in the construction,which has a large impact on the gravity flow sewers at the same shallow underground space.The article analyzes the impact of rail transit engineering construction on the relocation construction and operation of sewage pipeline network,and according to some typical design cases,puts forward the optimization proposals and measures.
Keywords:rail transit  sewage pipeline system  pipeline relocation  optimization measures
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号