龙江大桥高水位筑岛桥墩基础施工技术
引用本文:刘家裕,许勇波. 龙江大桥高水位筑岛桥墩基础施工技术[J]. 西部交通科技, 2010, 0(6): 113-116
作者姓名:刘家裕  许勇波
作者单位:广西长兴工程建设有限公司,广西,南宁,530001
摘    要:文章结合龙江大桥3#墩基础施工实例,对桥墩高水位筑岛围堰的施工方法进行探讨,着重介绍了土石筑岛围堰、水下承台施工等桥墩基础施工技术。

关 键 词:桥涵工程  基础施工  技术

The Foundation Construction Technology of the Built Island Pier on the High Water Level of Longjiang Bridge
LIU Jia-yu,XU Yong-bo. The Foundation Construction Technology of the Built Island Pier on the High Water Level of Longjiang Bridge[J]. Western China Communication Science & Technology, 2010, 0(6): 113-116
Authors:LIU Jia-yu  XU Yong-bo
Affiliation:(Guangxi Changxing Engineering Construction Co.,Ltd.,Nanning,Guangxi,530001)
Abstract:Based on the actual construction practice of 3# Pier Foundation,the article dis-cusses the construction method to built island and cofferdam of the high water level bridge,and mainly introduces the construction technique of pier foundation,such as earth-rock cof-ferdaming and building island,underwater pile cap construction etc.
Keywords:Bridge and culvert engineering  Foundation construction