客运专线900t整孔箱梁架设施工技术 |
| |
引用本文: | 陆宏鸿,刘海广.客运专线900t整孔箱梁架设施工技术[J].华南港工,2009(2). |
| |
作者姓名: | 陆宏鸿 刘海广 |
| |
作者单位: | 中交四航局第一工程有限公司; |
| |
摘 要: | 简要介绍中交第四航务工程局有限公司在哈大铁路客运专线曲家屯特大桥中采用自行过孔导梁式架桥机架设整孔箱梁的施工技术。
|
关 键 词: | 客运专线 架桥机 整孔箱梁 架设施工 |
The Installation Techniques for 900t Box Beams for Passenger Railway |
| |
Authors: | LU Hong-hong LIU Hai-guang |
| |
Institution: | The First Construction Company of CCCC Fourth Harbor Engineering Co. Ltd.;Guangzhou 510500;China |
| |
Abstract: | This paper summarizes the construction techniques for box beam installation using automatic moving bridge layer for Qujiatun extra large bridge of Harbin-Dalian passenger Railway |
| |
Keywords: | passenger railway bridge layer box beam installation |