首页 | 本学科首页   官方微博 | 高级检索  
     

高速铁路高架站箱梁利用既有梁场进行预制架设方案的探讨
引用本文:姚兵. 高速铁路高架站箱梁利用既有梁场进行预制架设方案的探讨[J]. 铁道建筑技术, 2011, 0(4): 14-16,27
作者姓名:姚兵
作者单位:中铁三局集团有限公司,太原,035100
摘    要:介绍了高速铁路高架站到发线简支箱梁利用既有梁场进行预制架设施工方案,根据现有施工设备及节点工期要求,为了加快施工进度,消除和减少对后期工程的影响,且减少项目投资的目的,对高架站到发线箱梁利用既有设备改造后进行预制架设。

关 键 词:高速铁路  高架车站  箱梁预制  架设设备  既有梁场

Study on Prefabricated Erection of Elevated Box Beam with Existing Beam Field in High-speed Railway
Yao Bing. Study on Prefabricated Erection of Elevated Box Beam with Existing Beam Field in High-speed Railway[J]. Railway Construction Technology, 2011, 0(4): 14-16,27
Authors:Yao Bing
Affiliation:Yao Bing(China Railway 3rd Bureau Group Co.Ltd.,Taiyuan 035100,China)
Abstract:The paper introduces the construction plan for prefabricated erection of high-speed railway projects from Elevated box beam to departure line simple box girder with existing beam field.Under the existing schedule node requirements and construction equipment,in order to speed up the construction schedule,eliminate and reduce the impact on later works,as well as to reduce investment,the paper also describes in detail the use of modified existing equipments for prefabricated erection.It is of good reference an...
Keywords:high-speed railway  elevated station  prefabricated box beam  erection equipment  existing beam field  