FPSO生活楼支撑件整体安装方案的应用 |
| |
引用本文: | 陈龙,蔡壮.FPSO生活楼支撑件整体安装方案的应用[J].船舶标准化工程师,2019,52(3):78-84. |
| |
作者姓名: | 陈龙 蔡壮 |
| |
作者单位: | 上海中远船务工程有限公司,上海 200231;上海中远船务工程有限公司,上海 200231 |
| |
摘 要: | 船舶及海洋工程产业的发展日新月异,对于船舶及海洋工程而言,传统的建造方式为独立制造管路、通风及电气并焊接各自的支撑件,这样会造成同一区域多种生根件的反复焊接。同时,在管机电密集区域的生活楼上,后期修改需要重复地进行火工作业,鉴于管路、通风和托架等安装件的重量相对较轻,建议采用支撑件整体安装方案以避免这种情况发生。
|
关 键 词: | STARTER FPSO 支撑件整体安装 三维建模 |
Application of Whole Support Installation Scheme for FPSO Accommodations |
| |
Authors: | CHEN Long CAI Zhuang |
| |
Institution: | (COSCO (Shanghai) Shipyard Co., Ltd., Shanghai 200231, China) |
| |
Abstract: | The development of the marine and offshore engineering industry is changing with each passing day.For marine and offshore engineering,the traditional method of construction is to independently manufacture pipes,ventilate and electrically and weld the respective supports,which will result in repeated welding of multiple rooting parts in the same area.At the same time,in the living building of the electromechanical-intensive area,the later modification requires repeated fire work.In order to avoid this kind of situation,in view of the pipe,ventilation and cable tray leader to install a relatively light in weight,recommended to use the whole installation scheme. |
| |
Keywords: | STARTER FPSO whole support installation scheme 3D modeling |
本文献已被 维普 万方数据 等数据库收录! |
|