既有线信号施工封锁的技术准备
引用本文:彭仁通. 既有线信号施工封锁的技术准备[J]. 铁路通信信号工程技术, 2011, 8(3): 87-90. DOI: 10.3969/j.issn.1673-4440.2011.03.026
作者姓名:彭仁通
作者单位:中铁二十四局集团有限公司,上海,200071
摘    要:既有线信号改造施工,要在短短几个小时的封锁时间内进行施工、试验、开通,顺利实现新旧设备的倒换,技术要求精,安全风险高,施工难度大,对铁路运输安全及效率影响极大。施工封锁前有效的技术准备,能够提前发现设计错误、施工错误以及为封锁顺利进行提供支持,确保信号施工封锁安全、正点开通。

关 键 词:铁路工程  信号改造  施工封锁  技术准备

Discussion on Technical Preparations of Signal Blocked for Construction on Existing Lines
Peng Rentong. Discussion on Technical Preparations of Signal Blocked for Construction on Existing Lines[J]. Railway Signalling & Communication Engineering, 2011, 8(3): 87-90. DOI: 10.3969/j.issn.1673-4440.2011.03.026
Authors:Peng Rentong
Affiliation:Peng Rentong
Abstract:For signal reconstruction of existing lines, it needs to fulfi ll construction, testing, commissioning and switching between new and existing equipment within few hours. So it is charactered with high technical requirements, high hazard, difficulties of construction and great effects on the railway transportation safety and effi ciency. The effi cient technical preparation before blocking for construction can fi nd errors in the design and construction early and provides the support for successful blocking ...
Keywords:railway engineering  signal reconstruction  construction blocking  technical preparations  