首页 | 本学科首页   官方微博 | 高级检索  
     检索      

大跨度钢斜拉桥的施工监控及其目标精度值
引用本文:郝超.大跨度钢斜拉桥的施工监控及其目标精度值[J].中国公路学报,2003,16(1):54-57.
作者姓名:郝超
作者单位:浙江大学,建筑工程学院,浙江,杭州,310027;浙江鼎盛交通建设有限公司,浙江,绍兴,312069
摘    要:结合南京长江第二大桥南汊桥的施工监控 ,就大跨度扁平钢箱梁斜拉桥施工监控的内容与方法、施工监控目标精度值进行探讨。

关 键 词:桥梁工程  钢斜拉桥  施工监控  扁平钢箱梁  目标精度值
文章编号:1001-7372(2003)01-0054-04
修稿时间:2002年1月27日

Construction control and control precision goal of long-span steel cable-stayed bridge
HAO Chao.Construction control and control precision goal of long-span steel cable-stayed bridge[J].China Journal of Highway and Transport,2003,16(1):54-57.
Authors:HAO Chao
Institution:HAO Chao 1,2
Abstract:Combined with the construction control of Nanjing Second Yangtz River Bridge, the contents and methods of construction control, the control precision goal of long span flat steel box shaped girder cable stayed bridge are discussed in this paper.
Keywords:bridge engineering  steel cable  stayed bridge  construction monitor and control  flat steel box  shaped birder  goal precision of construction control  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号