首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Challenges raised by freight for the operations planning of a shared-use rail network. A French perspective
Institution:1. G.E. Global Research Center, Niskayuna, NY 12309, USA;2. Department of Electrical, Systems, and Computer Engineering, Rensselaer Polytechnic Institute, Troy, NY 12180, USA;3. Department of Industrial and Systems Engineering, Rensselaer Polytechnic Institute, Troy, NY 12180 USA
Abstract:Operating rail infrastructures that are shared among different uses is complex. In Western Europe, the predominance of passenger traffic over freight has traditionally led to thorough scheduling of capacity use, with an increasing tendency to anticipate through the design of regular-interval timetables. The paper discusses the specific challenges posed by fitting freight into the timetabling process for a mixed-use rail network, based on current French experience. The analysis is carried out from the perspective of the infrastructure manager. It is mainly supported by the results of a series of about 30 interviews, carried out in 2012 and 2013 with the parties involved in the timetabling process. The paper provides a comprehensive understanding of the process in terms of organization, rules and practices, with an emphasis on the characteristics of freight traffic compared with passenger traffic. The author highlights three key management issues for the French infrastructure manager when dealing with freight: (1) the uncertainty surrounding the mid-long term development of the rail freight market at the national level; (2) the heterogeneity resulting from the diversity of commodities, convoys and profiles and behaviors of the capacity applicants; (3) the volatility of some freight traffic resulting in a great amount of activity in the later stages of the timetabling process. If uncertainty about the future appears to be a highly sensitive issue in the French context, heterogeneity and volatility of freight traffic can be perceived as management challenges that may be experienced, to a greater or lesser degree, on other rail networks.
Keywords:Rail freight  Infrastructure manager  Capacity  Timetabling  Shared-use network
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号