首页 | 本学科首页   官方微博 | 高级检索  
     检索      

砂卵石地层盾构隧道刀具更换方案研究
引用本文:刘树山.砂卵石地层盾构隧道刀具更换方案研究[J].隧道建设,2008,28(3):268.
作者姓名:刘树山
作者单位:中铁十三局集团第二工程有限公司
摘    要:砂卵石地层盾构隧道更换刀具技术始终是困扰工程的一大难题。通过对砂卵石地层盾构更换刀具时地层坍塌机理的研究,提出了采用AB液填充注浆的方式。工程实例表明,采用AB液新型注浆技术方案比较适合在该地层的换刀加固。

关 键 词:   砂卵石地层成都地铁盾构隧道换刀方案  
收稿时间:2008-03-25
修稿时间:2008-05-08

Study on Ground Consolidation Scheme for Cutting Tool Replacement during Shield Tunneling in Cobble and Sand Strata
LIU Shushan.Study on Ground Consolidation Scheme for Cutting Tool Replacement during Shield Tunneling in Cobble and Sand Strata[J].Tunnel Construction,2008,28(3):268.
Authors:LIU Shushan
Institution:The 2nd Branch of China Railway 13th Bureau Group
Abstract: It is very difficult to replace the cutting tools during shield tunneling in cobble and sand ground. In the paper, the mechanism of ground collapse occurring during the replacement of the cutting tools during shield tunneling in cobble and sand ground is studied and the scheme of AB grout injection is recommended for the ground consolidation in the cutting tool replacement. The scheme has been applied in the shield tunneling works, which shows that the scheme is suitable for the ground consolidation during shield tunneling in cobble and sand ground for the purpose of cutting tool replacement.
Keywords:cobble and sand strataChengdu Metroshield tunnelingcutting tool replacement
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号