首页 | 本学科首页   官方微博 | 高级检索  
     检索      

甲供材料费用计算方法的探讨
引用本文:霍彦恒.甲供材料费用计算方法的探讨[J].铁路工程造价管理,2014(2):6-8.
作者姓名:霍彦恒
作者单位:中铁电气化局集团电气化公司,北京100036
摘    要:在工程施工招标公布的招标价中,不少工程不合甲供材料费,但这些甲供材料同样需要施工单位进行施工和安装,那么如何合理而准确的计算施工单位完成的甲供材料的费用和界定其归属,是承发包双方特别关注的问题。此文针对甲供材料费用现行计算方法存在的问题进行分析,通过分析提出改进后的计算方法。并通过某新建铁路接触网工程实例,采用2种计算方法分别计算甲供材料的费用,通过比较,确实存在差异。本应属于施工单位的费用,却因现行计算方法的硬性规定,归甲方所有。

关 键 词:铁路建设  甲供材料  贾用计算

Discussion of Material supplied by Party A Cost Calculation Method
Abstract:In the price of project construction bidding, it does not contain cost of material supplied by Party A in a lot of engineering, but these materials also need to be constructed and installed by construction unit. Therefore, how to reasonably and accurately calculate the cost of material supplied by Party A and define the ownership is the issue concerned by the contracting parties. Aiming at analyzing the problems of cost calculation method of material supplied by Party A, the improved calculation method is put forward through the analysis. Taking a newly built railway catenary project as an example, two calculation meth- ods are calculated respectively for the cost of the material supplied by Party A. There is difference by comparison. The cost which should belong to the construction unit, but because of the hard rules about the current calculation method, it is owned by party A now.
Keywords:Railway construction  Material supplied by Party A  Cost calculation  Discussion
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号