首页 | 本学科首页   官方微博 | 高级检索  
     检索      

排水预压加固法在温州半岛北堤建设中的应用
引用本文:林荣.排水预压加固法在温州半岛北堤建设中的应用[J].中国港湾建设,2009(2):33-36.
作者姓名:林荣
作者单位:温州市瓯江口开发建设总指挥部,浙江,温州,325000
摘    要:论述了温州半岛北堤建设中,采用排水预压加固技术对软土地基进行处理,解决了深厚软粘土地基上加载困难、建设周期长、路堤建设完成后沉降过大的难题;施工过程中采用的关键技术、原位控制技术、施工控制指标,大幅度降低了路堤的工后沉降,保证了施工期的地基稳定和工程的按期完成。为类似工程建设提供了宝贵经验。

关 键 词:浮泥  淤泥  排水预压  沉降  稳定  软土地基

Improvement of Soft Soils by Dewatering in Construction of Northern Dike of Wenzhou Peninsula
LIN Rong.Improvement of Soft Soils by Dewatering in Construction of Northern Dike of Wenzhou Peninsula[J].China Harbour Engineering,2009(2):33-36.
Authors:LIN Rong
Institution:Wenzhou Oujiang Estuary Development and Construction Management;Wenzhou;Zhejiang 325000;China
Abstract:The soft clayey foundation was improved with the dewatering technique during the construction of northern dike of Wenzhou peninsula,thus solving the problems of imposition of loads on a deep and soft clay foundation,long construction pe-riod and overlarge settlement after the construction of embankment.The key technologies adopted during construction,in-situ control technique and target-control measures during construction reduced significantly the post-construction settlement of the embankment and ensured ...
Keywords:Mud  silt  drainage preloading  settlement  stability  soft clay ground  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号