首页 | 本学科首页   官方微博 | 高级检索  
     检索      

大连地铁明挖车站降阻措施研究
引用本文:张筱.大连地铁明挖车站降阻措施研究[J].现代城市轨道交通,2013(2):53-56.
作者姓名:张筱
作者单位:中铁工程设计咨询集团有限公司济南设计院,工程师,山东济南 250022
摘    要:在地铁设计中,接地是非常重要的部分,影响人身安全及运营安全,大连地铁地下为岩石结构,土壤电阻率非常大,经过对垂直接地体法、非金属降阻模块法、双层接地网法等3种接地方法的计算对比,以及经济、安全性等综合方面考虑,选用了双层接地网法对大连地铁明挖车站进行降阻。

关 键 词:地铁车站  接地电阻  降阻措施

Study on Resistance Reduction Measures for Dalian Cut and Cover Metro Station
Zhang Xiao.Study on Resistance Reduction Measures for Dalian Cut and Cover Metro Station[J].Modern Urban Transit,2013(2):53-56.
Authors:Zhang Xiao
Abstract:In metro design, the grounding is a very important part, which may impact personal safety and operational safety. Dalian metro underground rock structures have very big soil resistivity. After calculation and comparison of 3 grounding methods including the vertical grounding, non-metallic resistance reduction modular approach, and double -grounding grid method, as well as the studies of cost effectiveness, safety and other considerations, a double-grounding grid for Dalian cut and cover metro stations is selected to reduce resistance.
Keywords:metro station  grounding resistance  resistance reduction measures
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号