钢管砼拱桥吊杆更换施工控制技术 |
| |
引用本文: | 陈思甜,王静,龚尚龙. 钢管砼拱桥吊杆更换施工控制技术[J]. 重庆交通大学学报(自然科学版), 2005, 24(2): 12-17 |
| |
作者姓名: | 陈思甜 王静 龚尚龙 |
| |
作者单位: | 重庆交通学院,重庆,400074;重庆交通学院,重庆,400074;重庆交通学院,重庆,400074 |
| |
摘 要: | 以乐山市沙湾大渡河大桥的维修加固为依托工程,采用MSC.Marc2001高精度非线性分析软件对吊杆更换过程进行仿真分析,制定出相应的施工控制方法,其成功经验对类似的维修加固工程有参考价值.
|
关 键 词: | 钢管砼拱桥 吊杆更换 施工控制 |
文章编号: | 1001-716X(2005)02-0012-06 |
修稿时间: | 2004-04-19 |
Study on construction control technique in the process of replacing suspender of CFST arch bridge |
| |
Abstract: | The construction control technique in the process of replacing suspender of CFST arch bridge is introduced in this paper. The technique was worked out according to simulation result from a program named MSC.Marc2001. And the technique has been applied to the project of Dadu-he bridge which in Le-shan city,Sichuan. |
| |
Keywords: | CFST arch bridge replacing suspender construction control |