龙潭河大桥施工塔吊基础转换技术
引用本文:甘容军.龙潭河大桥施工塔吊基础转换技术[J].铁道建筑技术,2008(5):52-53,58.
作者姓名:甘容军
作者单位:中铁十三局集团第三工程公司,湖北襄樊,441000
摘    要:结合龙泸蓉西高速公路龙潭河大桥墩身施工实际,介绍了塔吊基础转换技术,并对转换基础进行验算。该项技术在龙潭河大桥施工中成功应用,节约设备投入,经济效益显著。

关 键 词:高墩  塔吊机基础  转换程序

Conversion Technology for Crane Foundation in Longtanhe Bridge Construction
Gan Rongjun.Conversion Technology for Crane Foundation in Longtanhe Bridge Construction[J].Railway Construction Technology,2008(5):52-53,58.
Authors:Gan Rongjun
Institution:Gan Rongjun (China Railway 13^th Bureau Group Co. Ltd. , Xiangfan 441000, China)
Abstract:In light of the construction practice of Longtanhe Bridge on Longhurongxi express way, this paper introduces the conversion technology for crane foundation, and checks the computation of conversion foundation. This technology's application in Longtanhe Bridge saved the equipment input and got great economic benefits.
Keywords:high pier  crane machine foundation  conversion program