首页 | 本学科首页   官方微博 | 高级检索  
     检索      

浅议盾构过矿山法隧道空推段施工质量控制
引用本文:李锦富.浅议盾构过矿山法隧道空推段施工质量控制[J].现代隧道技术,2012,49(2):65-70.
作者姓名:李锦富
作者单位:深圳市市政工程总公司隧道公司,深圳,518000
摘    要:盾构在通过矿山法隧道施工过程中,因控制不当会产生一系列的质量问题。文章研究分析了现场施工表现出来的管片错台、隧道渗漏水、管片上浮、管片破损等质量缺陷及其形成原因,并阐述了预防和控制其质量缺陷的相关措施。

关 键 词:盾构过空推段  质量控制  规避措施

Construction Quality Control of a Shield Passing Through a Mined Tunnel
Li Jinfu.Construction Quality Control of a Shield Passing Through a Mined Tunnel[J].Modern Tunnelling Technology,2012,49(2):65-70.
Authors:Li Jinfu
Institution:Li Jinfu(Tunneling Company of Shenzhen Municipal Engineering Corporation,Shenzhen 518000)
Abstract:Shield driving through a mined tunnel often produces a series of significant problems.This paper analyzes the defects of segment staggering,water leakage,segment floating,segment damage and their causes and addresses the protective measures that can be taken.
Keywords:Shield driving through mined tunnel  Quality control  Protective measures
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号