摘 要: | ![]() 通过数值模拟的方法,探讨大断面隧道,由于车行横洞的开挖引起的主洞隧道交叉口处围岩位移的变化。
|
关 键 词: | 隧道 围岩 车行横洞 施工 位移 变化 |
The Analysis of the Influence of Excavation of Lateral Hole on the Main Tunnel for Nanshan Tunnel |
| |
Affiliation: | LIU Xiao.liang (Shanxi Provincial Survey & Design Institute of Communications, Taiyuan, Shanxi 030012, China) |
| |
Abstract: | ![]() Due to the excavation of lateral hole ,the paper discussed the surrounding rock displacement change of the main tunnel intersection in the large-section tunnel construction by numerical simulation. |
| |