首页 | 本学科首页   官方微博 | 高级检索  
     检索      

一种双排长短密排桩基础的框架海堤结构
引用本文:黄朝煊.一种双排长短密排桩基础的框架海堤结构[J].水运工程,2018(11):167-173.
作者姓名:黄朝煊
作者单位:浙江省水利水电勘测设计院,浙江 杭州 310002
基金项目:浙江省基础公益研究计划项目(LGF18E090004),浙江省水利厅科技计划项目(RC1701),浙江省水利水电勘测设计院科标业资助项目(B1609,B1803)
摘    要:针对目前滨海地区深厚淤泥质地基中沿海大桥与一般土石海堤交叉影响问题,通过桩型比选(钻孔灌注桩、大直径薄壁筒桩以及U形预应力板桩)、桩基布置方案比选(密排、2倍桩径间隔以及满堂布置)等深入对比分析,结合竖向承载力、水平承载力计算对比,提出了一种新型双排长短密排桩基础的框架肋板结构海堤结构;并对深厚淤泥地基进行浅层满堂固化加固处理。该新型结构能有效避免一般土石堤沉降对沿海大桥桥墩负摩擦阻力的不利影响,能有效保证大桥安全,同时能大量节省交叉段桥梁和交叉段海堤的施工工期。通过完工后的实际沉降等监测数据分析,认为该新型结构有效地保证了交叉段桥梁的安全。

关 键 词:围垦工程  海堤  桩基  水平承载力  沉降

A frame seawall structure of double row with long and short densely packed pile foundation
HUANG Chao-xuan.A frame seawall structure of double row with long and short densely packed pile foundation[J].Port & Waterway Engineering,2018(11):167-173.
Authors:HUANG Chao-xuan
Institution:Zhejiang Design Institute of Water Conservancy and Hydroelectric Power,Hangzhou 310002,China
Abstract:In view of the current cross influence between the coastal bridge and the general earth-rock seawall in the deep silty foundation in the coastal area,by the pile type comparison (bored pile,large-diameter thin-walled pile and U-shaped prestressed sheet pile) and pile foundation layout scheme comparison and selection (closed row,2 times pile diameter interval and all-round arrangement) and other in-depth comparative analysis,combined with vertical bearing capacity and horizontal bearing capacity calculation and comparison,a new type of ribbed structure seawall structure with double row long and short densely packed pile foundation is proposed.The deep silt foundation is all-round solidified and strengthened in shallow layer.The new structure can effectively avoid the adverse impact of the settlement of the general earth embankment on the negative frictional resistance of the pier of the coastal bridge,effectively ensure the safety of the bridge,and at the same time save the construction period of the cross section bridge and the cross section seawall.Through the analysis of monitoring data such as actual settlement after completion,it is considered that the new structure effectively ensures the safety of the bridges at the intersection.
Keywords:reclamation work  seawall  pile foundation  horizontal bearing capacity  settlement
本文献已被 CNKI 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号