首页 | 本学科首页   官方微博 | 高级检索  
     检索      

洋山四期陆域回填层地基加固施工技术试验研究
引用本文:肖 飞,王千星.洋山四期陆域回填层地基加固施工技术试验研究[J].水运工程,2018(11):162-166.
作者姓名:肖 飞  王千星
作者单位:中建港务建设有限公司,上海 200433,中建港务建设有限公司,上海 200433
摘    要:针对洋山四期陆域回填情况复杂以及自动化堆场使用要求较高等问题,对回填层地基加固提出振冲、强夯和振动碾压相结合的综合施工方法,并进行试验段试验研究。通过试验,确定地基加固方法各项技术参数和施工工艺,研发一套振冲监控系统,进行了强夯法对承台影响的监测。试验结果表明:振冲法地基沉降可达90. 6 cm,强夯法地基沉降可达59. 1 cm;强夯法对承台振动和沉降影响在安全范围内;通过静、动力触探和压实度,加固后地基满足设计要求,可以为后续地基加固全面开展提供依据。

关 键 词:陆域回填  地基加固  振冲法  强夯法  监控系统

Experimental study on ground reinforcement construction technology of backfill layerin Yangshan Phase IV project
XIAO Fei and WANG Qian-xing.Experimental study on ground reinforcement construction technology of backfill layerin Yangshan Phase IV project[J].Port & Waterway Engineering,2018(11):162-166.
Authors:XIAO Fei and WANG Qian-xing
Institution:China State Construction Harbor Construction Co.,Ltd.,Shanghai 200433,China and China State Construction Harbor Construction Co.,Ltd.,Shanghai 200433,China
Abstract:Aiming at the complexity of the backfilling of the Yangshan Phase IV land area and the high requirements for the use of automated storage yards,a comprehensive construction method for vibro-compaction,dynamic compaction,and vibration rolling compaction was proposed for the reinforcement of the backfill layer,and a test was conducted.Through the test the technical parameters and construction technology of the ground reinforcement method were determined,a vibration monitoring system was developed and the influence of dynamic compaction on the bearing platform was monitored.The test results show that the settlement of vibration foundation can reach 90.6 cm,the settlement of dynamic foundation can reach 59.1 cm,and the impact of dynamic compaction method on the vibration and settlement of the platform is within the safe range.After static & dynamic penetration and compaction,the reinforced foundation can meet the design requirements and can provide comprehensive foundation for the subsequent ground reinforcement.
Keywords:land backfill  ground reinforcement  vibro-compaction  dynamic compaction  monitoring system
本文献已被 CNKI 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号