首页 | 本学科首页   官方微博 | 高级检索  
     检索      

长江口南槽航道疏浚工程实施效果与展望
引用本文:赵德招,郑文燕,万远扬.长江口南槽航道疏浚工程实施效果与展望[J].水运工程,2016(11):140-144.
作者姓名:赵德招  郑文燕  万远扬
作者单位:上海河口海岸科学研究中心,上海 201201;交通运输部长江口航道管理局,上海 200003,交通运输部长江口航道管理局,上海 200003,上海河口海岸科学研究中心,上海 201201
基金项目:国家自然科学青年基金(41506108)
摘    要:长江口南槽航道疏浚工程2013—2015年现场实测资料表明,工程实施后南槽5.5 m航道实现了疏浚贯通,航槽稳定运行且易于维护,达到了预期的建设目标,并为南槽航道进一步开发创造了条件。同时,提出南槽航道后续开发建设应着重遵循的原则。研究成果可为长江口航道体系建设、上海市滩涂围垦和长江口综合整治等提供技术参考。

关 键 词:长江口南槽航道疏浚工程  南槽5.5  m航道  维护疏浚  实施效果  建设展望

Implementation effect and prospect of south passage waterway dredging engineering in the Yangtze estuary
ZHAO De-zhao,ZHENG Wen-yan and WAN Yuan-yang.Implementation effect and prospect of south passage waterway dredging engineering in the Yangtze estuary[J].Port & Waterway Engineering,2016(11):140-144.
Authors:ZHAO De-zhao  ZHENG Wen-yan and WAN Yuan-yang
Institution:Shanghai Estuarine and Coastal Science Research Center,Shanghai 201201,China;Yangtze Estuary Waterway Administration Bureau,Ministry of Transport,Shanghai 200003,China,Yangtze Estuary Waterway Administration Bureau,Ministry of Transport,Shanghai 200003,China and Shanghai Estuarine and Coastal Science Research Center,Shanghai 201201,China
Abstract:Based on the field measured data of year 2013 to 2015 implementation of the south passage waterway dredging engineering in the Yangtze estuary,we know that the 5.5 m navigation channel is through the south passage after the dredging engineering construction,and the navigation channel is stable for operation and easy to maintenance,which achieves the desired construction target and creates conditions for further channel development of the south passage.Meanwhile,main principles to be followed in the further navigation channel development and construction of the south passage is put forward.The research results can provide technical reference for the Yangtze estuary waterway system construction,Shanghai tideland reclamation and the Yangtze estuary comprehensive regulation.
Keywords:south passage waterway dredging engineering in the Yangtze estuary  5  5 m navigation channel of south passage  maintenance dredging  implementation effect  construction prospect
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号