盾构模拟江底掘进接收技术
引用本文:周登武.盾构模拟江底掘进接收技术[J].隧道建设,2010,30(5):565-568.
作者姓名:周登武
作者单位:中铁隧道集团二处有限公司,河北,三河,065201
摘    要:针对盾构接收井地质条件差、埋深大、加固体加固质量不理想,如出现渗、漏水、流砂等现象时采取相应注浆封堵措施尚不能彻底根治的情况,结合中石化川气东送安庆长江穿越隧道工程实例,通过采用接收井回填砂、灌水的措施及盾构模拟江底掘进接收技术,并取得良好效果,可供类似工程参考。

关 键 词:盾构  回填砂  灌水  模拟江底掘进
收稿时间:2010-04-14
修稿时间:2010-09-25

Shield Arriving by Simulating Boring under River
ZHOU Dengwu.Shield Arriving by Simulating Boring under River[J].Tunnel Construction,2010,30(5):565-568.
Authors:ZHOU Dengwu
Institution:The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China
Abstract:During the arriving of the shield of Anqing Yangtze River Crossing Tunnel on the gas transmission pipeline from Sichuan Province to East China, countermeasures such as sand backfilling and water filling are taken so as to simulate shield boring under rivers and satisfactory effect has been achieved. The shield arriving technology applied in the project is presented in the paper. The technology is applicable to cases such as poor geological conditions of shield arriving shaft, huge covers, poor reinforcement of the strata and water/sand inflows that can not be coped with by grouting. The paper can provide reference for similar works in the future.
Keywords:shield  sand backfilling  water filling  simulation of boring under river
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文